+menu-


  • Category Archives I’ve got a pen
  • The Cross President Trump and the Swastika

    As we know, there are known knowns; there are things we know we know. We also know there are known unknowns; that is to say we know there are some things we do not know. But there are also unknown unknowns—the ones we don’t know we don’t know. 

    I don’t remember when I first heard that quote?  In fact, I didn’t even know who said it.

    My  known on Jan 26, 2011, was, my Christian heritage, singing the Old Rugged Cross,  the Lincoln Memorial,  American Revolution, Paul Revere, Arlington Cemetery,  the Declaration of Independence, the U.S. Constitution and the Bill of Rights.  

    And, I knew on Jan 26, 2011 that when American Citizens  fear their what their own government is going to do to them on WA State Shoreline Update (SMP) in Port Angeles, Clallam County WA, U.S.A., it was unacceptable to me.

    And, I thought… Somebody should do something about that.  Then I realized I was somebody and I could do something about that.

    And, of course everybody always said “Contact your elected representatives”

    My shocking, wakeup  call was on Jan 27, 2011, it was the unknown  ” I could care less attitude of elected representation”,  not one of the  three  elected Clallam County representatives  in Olympia WA bothered to respond to my American, voting, taxpaying citizens  phone calls of concern.

    So after being snubbed, pandered to, ignored, scoffed at and insulted by my county and state elected representative on every concern I had.

    I DID SOMETHING ABOUT THAT. Researching and documenting  and disseminating all levels and all things Government from Jan 27, 2011. I submitted over 150 public comments on the Clallam County SMP Update, as  an appointed volunteer  member of the SMP Citizens Committee.

    My website behindmyback.org went on line on Jan 29, 2013,  after I had documented for two years, that most of my business was being done by the government, behind my back, behind closed doors.

    I identified my mission, using the image of Abram Lincoln’s statue in WA DC, and the words of Abram Lincoln. That a Government of the people, by the people and for the people shall not perish from the earth.

    I identified myself three days later.

     Behind My Back | My code name “Pearl Revere”

    www.behindmyback.org/2013/02/01/my-code-name-pearl-revere/

    Feb 1, 2013 – My code name is “Pearl Revere” This blog is all about US, “We the People”. I had hoped that setting up a blog would give “We the people” a …

    ———————————————————————————–

    I doubled down on Mar 28, 2014

    Behind My Back | Paul and Pearl Revere

    www.behindmyback.org/2014/03/28/paul-and-pearl-revere/

    Mar 28, 2014 – PAUL REVERE WAS NOT SILENT OR FEARFUL On the night of … read more at: http://www.poets.org/viewmedia.php/prmMID/15640#sthash.

    So long, as my name is Pearl Rains Hewett (AKA Pearl Revere) I shall continue running through cyber space with red flag warnings, asking questions and disseminating documented facts.

    So, ask yourself, what’s the big deal? They are not taking our lives. They are just destroying our lives.

    They are just controlling our lives, they are just taking our freedom,  they are just taking our liberty, our pursuit of happiness and they are just taking control of our private property and denying us our Constitutional rights.

    —————————————————————————————-

    This is Post #984 on behindmyback.org  Jan 29, 2013 to Aug 30, 2017.

    I could write a documented  book on the government , things we know we know, also know, the known unknowns;  even after all of my research and documentation, we know there are some things we do not know. But alas, there are also unknown unknowns—Indeed, the ones we still don’t know we don’t know. 

    ——————————————————

    April 30, 2016,  I received a phone call from Senator Benton the WA State Chairman for Trump. He is looking for a TRUMP CAMPAIGN CHAIR PERSON FOR CLALLAM COUNTY WA. (I said I was too old)

     —————————————————————–

    Friday, May 13, 2016 I have been designated.. by Senator Benton as the TRUMP CAMPAIGN CHAIR PERSON FOR CLALLAM COUNTY WA. 

     ———————————————————————-

    Last Year on Aug 30, 2016, I attended the Trump Rally in Everett WA. TO CELEBRATE MY 75TH BIRTHDAY.

    Senator Benton introduced Donald J. Trump

    Full Event: Donald Trump Rally in Everett, Washington (August 30 …

    ▶ 1:21:58

    Aug 30, 2016 – Uploaded by TRUMP TV NETWORK

    Watch Live: Donald Trump Rally in Everett, Washington at Xfinity Arena of Everett (August 30, 2016) Full …

    ————————————————————————————

    By the Grace of God, President Donald J. Trump was ELECTED (AND HILLARY WAS NOT SELECTED) as President of the United States Of America On Nov 8, 2017.

    So today, Aug 30, 2017, is my 76th birthday, And, I am celebrating the election of my President Trump.

    In, Port Angeles,  Clallam County, WA U.S.A. by popular vote Donald J. Trump is the ELECTED President of the United States of America.

    So long, as my name is Pearl Rains Hewett (AKA Pearl Revere) I shall continue running through cyber space with red flag warnings, asking questions and disseminating documented facts.

    ——————————————————————

    The Cross – President Trump and the Swastika

    THE SWASTIKA

    My Trump sign was sprayed with silver spray paint, Impeach and a Swastika, during the night of Aug 18, 2017. I reported it to the Port Angeles Police Dept Aug 19, 2017. 

    Incident #2017-17112.

    For the time being, I am leaving my Impeach Swastika Trump hate sign, up on my fence.

    In an email to my family and friends I called the PAPD Incident #2017-17112.

    FEELING THE LOVE….

    ————————————————————–

    My Trump signs have been stolen, and, I have been threatened, they will break out my window, they will burn my house down (reported by my neighbor). And, in person, three thugs of dark complexion, in an older silver vehicle, cruising very slowly by my house, giving me the evil eye while I was standing on my own front porch, with their boom box blaring “Fuck Trump” over and over and over and over again.

    FOR THE RECORD

    Behind My Back | Trump Signs Theft, Vandalism and Threats

    www.behindmyback.org/2016/06/26/trump-signs-theft-vandalism-and-threats/

    Jun 26, 2016 – Theft! Vandalism! written threats (Tacoma WA “I will Kill your Family” a … The rash of vandalized, destroyed and ripped down Trump signs all …

    Posted on June 26, 2016 1:13 pm by Pearl Rains Hewett Comment

    The GOOD, the BAD and the UGLY

    ———————————————————————————–

    December 1770 Facts are stubborn things; and whatever may be our wishes, our inclinations, or the dictates of our passion, they cannot alter the state of facts and evidence. John Adams

      Behind My Back | 1781 The First American Bible

    www.behindmyback.org/2014/09/18/1781-the-first-american-bible

    1781 THE FIRST AMERICAN BIBLE “The truth is incontrovertible, manic may resent it, ignorance may deride it, malice may distort it, but here it is.” January 21, 1781 …

    “The only foundation for . . . a republic is to be laid in Religion. Without this there can be no virtue, and without virtue there can be no liberty, and liberty is the object and life of all republican governments.”

    Benjamin Rush United States Congress 1782

     “Of all the dispositions and habits which lead to political prosperity, religion and morality are indispensable.”
    George Washington


  • WA State DOE Emergency Fee Rule?

    July 20, 2016 Public Records Emergency Rule WAC 173-03-9000E Calculation of actual costs of producing copies of public records declared to be unduly burdensome—Adoption of statutory fee schedule.

     SO? THE DOE?  SOMEBODY DECLARED AN EMERGENCY DOE RULE?

     WAC… WAC… WAC…

    WHY BOTHER WITH THE ACTUAL COST FOR PRODUCING COPIES OF PUBLIC RECORDS FOR THE PUBLIC?

    HB 1595, passed in the 2017 legislative session

    Chapter 304, Laws of 2017, sc. 3, amending RCW 42.56.120,

    AND AN AGENCY MUST HAVE IN PLACE EITHER A STATEMENT FOLLOWING (PUBLIC?)  NOTICE AND PUBLIC HEARING THAT ESTABLISHES THE ACTUAL COSTS OF PRODUCING RECORDS….

    AND THAT WOULD BE UNDULY BURDENSOME FOR THE DOE?

    SO, THE DOE WILL ADOPT THE STATUTORY FEE SCHEDULE.

    —————————————————————————–

    —– Original Message —–

    From: Ballard, Laura (ECY)

    To: ECOLOGY-WAC-TRACK@LISTSERV.WA.GOV

    Sent: Monday, July 24, 2017 4:44 PM

    Subject: The following emergency rulemaking adoption was filed with the Office of the Code Reviser: Public Records Emergency Rule WAC 173-03-

    The following emergency rulemaking adoption was filed with the Office of the Code Reviser:

    July 20, 2016

    Public Records Emergency Rule WAC 173-03-9000E Calculation of actual costs of producing copies of public records declared to be unduly burdensome—Adoption of statutory fee schedule.

    For more information:

    http://www.ecy.wa.gov/laws-rules/wac17303/1614ov.html

    To join or leave ECOLOGY-WAC-TRACK click here:

    http://listserv.wa.gov/cgi-bin/wa?A0=ECOLOGY-WAC-TRACK

    Thank you for using WACTrack.

    Have a good day!

    ———————————————————————————-

    Representative Terry Nealey (R-Dayton) and Representative Joan McBride (D-Kirkland) introduced the bills.  They would update the 1972 Public Records Act, INCLUDING FEES contained in the original law

    HB 1595, passed in the 2017 legislative session

    HB 1595 BECAME LAW ON JULY 23, 2017

    Chapter 304, Laws of 2017, sc. 3, amending RCW 42.56.120,  

    THE PROVISION OF THE PUBLIC RECORDS ACT (PRA) THAT GOVERNS AGENCY CHARGES TO REQUESTERS FOR PROVIDING COPIES OF PUBLIC RECORDS.

    According to a 2016 report from the Washington State Auditor’s Office, the number of requests increased by 36% from 2011 to 2015, and last year, state and local governments spent more than $60 million to fulfill 285,000 requests – a portion of which were automated “bot” requests from computers. Only 1% of the costs were recovered by the original law’s fee structure.

    These amendments in HB 1595 were designed to modernize this provision to reflect changes in the way agencies PROVIDE copies of records to requesters.

    and an agency must have in place either a statement following notice and public hearing that establishes the ACTUAL COSTS of producing records,

     or a rule that declares the calculation of actual costs would be “unduly burdensome.” Otherwise, an agency would not be able to impose copy fees on PRA requestors.

    HB 1595  IS A NEW WA STATE LAW EFFECTIVE  JULY 23, 2017

    WITH FEES BASED ON ACTUAL COST?

    Representative Terry Nealey (R-Dayton)  said actual costs could also be based upon a SEATTLE CITY DETAILED COST STUDY.

    “The city of Seattle estimates it will spend as much as $3 million this year for PRA request fulfilment, including electronic requests, but expects less than $10,000 in cost recovery,”

    Representative Terry Nealey (R-Dayton) added. “Our legislation would enable an agency to study its actual costs of making and preparing for delivery electronic copies of documents for a requestor,

    AND THEN CHARGE A MODEST FEE BASED ON COPYING COSTS.

    WE THINK THIS WILL REDUCE VEXATIOUS REQUESTS WHILE PRESERVING ACCESS WITH AN UPDATED FEE SYSTEM.”

    ——————————————————————————–

    AND, THEN CHARGE A MODEST FEE BASED ON ACTUAL COST?

    ————————————————————————————–

     Behind My Back | Fee Fie Foe Fum

    www.behindmyback.org/2013/10/26/fee-fie-foe-fum/

    Oct 26, 2013 – “Feefifofum” is the first line of a historical quatrain famous for its use in the classic English fairy … http://en.wikipedia.org/wiki/Fee-fie-foefum.

     ——————————————————————————–

    ECOLOGY is taking the latter approach, declaring by rule that it will be “unduly burdensome” to calculate actual costs, and has already filed a pre-proposal to begin the permanent rulemaking process.

    ECOLOGY will conduct this permanent rulemaking according to normal rulemaking procedures, but cannot complete it until some months after the requirements of HB 1595 take effect on July 23, 2017.

    ECOLOGY finds that it is in the general welfare and the public interest, and benefits requesters and the agency, to adopt the emergency rule in order to preserve AND UPDATE FEES in accordance with the legislatively adopted schedule.

    Without further action, this would create a period of months during which no statement or rule would be available to the public regarding PRA costs or the methods of calculating them, creating confusion and uncertainty regarding Ecology’s fee structure and ITS ABILITY TO CHARGE FEES.

    Because this appears to be contrary to the intent of HB 1595 and the PRA,

    ECOLOGY intends to adopt its declaration initially by emergency rule, to avoid confusion and to remain in compliance with the PRA, as amended.

    This declaration will allow Ecology to utilize the statutory default fee schedule created by the Legislature in the 2017 amendments starting on July 23, 2017, the date the legislation goes into effect, and to be in full compliance with the PRA, as amended.

    ————————————————————————————–

    ECOLOGY WILL CONDUCT THIS PERMANENT RULEMAKING ACCORDING TO NORMAL RULEMAKING PROCEDURES, BUT CANNOT COMPLETE IT UNTIL SOME MONTHS AFTER THE REQUIREMENTS OF HB 1595 TAKE EFFECT ON JULY 23, 2017.

     ECOLOGY has already filed a pre-proposal to begin the permanent rulemaking process.

    A STATEMENT FOLLOWING (PUBLIC?)  NOTICE AND PUBLIC HEARING THAT ESTABLISHES THE ACTUAL COSTS OF PRODUCING RECORDS….

    ——————————————————-

    To join or leave ECOLOGY-WAC-TRACK click here:

    http://listserv.wa.gov/cgi-bin/wa?A0=ECOLOGY-WAC-TRACK

    Thank you for using WACTrack.

    Have a good day!

    ——————————————————————

    Has anyone received a definitive legal  answer to this question?

    Behind My Back | WA DOE $50 Comment Recording Fee?

    www.behindmyback.org/2017/07/12/6854/

    Jul 12, 2017 – Protests must be accompanied by a $50 recording fee payable to the Department of …. www.behindmyback.org/2013/10/26/fee-fie-foe-fum/.


  • Due Process for Distracted Drivers Law?

    Gov. Jay Inslee (D) DUE PROCESS BY PUBLIC NOTICE?

     WA State Distracted Drivers Law ADOPTED 04/19/2017 

     VETOED by Gov. Jay Inslee (D)  MAY 16, 2017

    Gov. Jay Inslee (D) accelerated the law’s effective date to July 23, 2017

    Vagueness is generally considered to be a DUE PROCESS issue, because a law that is too vague to understand does not provide adequate notice to people that a certain behavior is required or is unacceptable.

    The “void for vagueness” doctrine argues that a law cannot be enforced if it is so vague or confusing that the average person could not figure out what is being prohibited or what the penalties are for breaking that law.

    ————————————————————————

    It doesn’t take too much effort to imagine a distracted driver suing the state over a disputed ticket for failure of DUE PROCESS ON PUBLIC NOTICE et al.

    —————————————————————-

    A law can be unconstitutionally vague in one of two main ways.

    First, the law may be void for vagueness if it does not adequately explain or state what behavior the law is meant to affect.  If the average citizen cannot figure out from reading the law what he should or should not do, a court may find that the law violates due process. 

    Second, a law may be void for vagueness if it does not adequately explain the procedures that law enforcement officers or courts must follow when enforcing the law or handling cases that deal with certain legal issues. 

    Specifically, a law may be found to be unconstitutionally vague if it gives a judge no idea how to approach or handle a case based on that law.

    —————————————————–

    ADOPTED 04/19/2017  WA State Distracted Drivers Law

    MAY 16, 2017 Gov. Jay Inslee (D)  vetoed a compromise by the Legislature that would have postponed enforcement of the Driving Under the Influence of Electronics (DUIE) Act until 2019.

    Gov. Jay Inslee (D)  surprised even the supporters of a distracted-driving law Tuesday when he accelerated the new crackdown, IN A LETTER TO THE SENATE DATED MAY 16, 2017.

    Gov. Jay Inslee (D) vetoed the section that gave drivers until 2019 to acclimate to the changes and instead declared Sunday, July 23, 2017 as the law’s effective date.

    The final version passed Wednesday pushed the proposed start date from Jan. 1, 2018, to Jan. 1, 2019, because several members wanted extra time for the public to adjust, according to prime sponsor Rep. Jessyn Farrell, D-Seattle.

    Farrell justified the wait on Wednesday, saying colleagues in both parties sought more TIME FOR A SUSTAINED EDUCATION campaign, for the public to adapt, and for motorists to obtain built-in communication systems. The State Patrol is currently understaffed but is striving to boost recruitment, with help from proposed raises this legislative session.

    Understaffed was confirmed yesterday by Kyle at  WSP media center, yesterday.

    ——————————————–

    Gov. Jay Inslee (D)  His abysmal record on TIME FOR A SUSTAINED EDUCATION speaks for it’s self

    ———————————————————————

    Gov. Jay Inslee (D) IS PERSONALLY RESPONSIBLE FOR SIGNING THE VETO. period

    It doesn’t take too much effort to imagine a distracted driver suing WA State over a disputed ticket  for failure of DUE PROCESS ON PUBLIC NOTICE et al. 

     But why would Gov. Jay Inslee (D) worry about a WA State lawsuit?

    After all  Gov. Jay Inslee (D) has  his nationally spotlighted Washington State Attorney General Bob Ferguson (D) to defend his VETO.

    After all , A law can be unconstitutionally vague in one of two main ways.

    And after all, Vagueness is generally considered to be a DUE PROCESS issue.

    AND, PUBLIC NOTICE IS A DUE PROCESS ISSUE


  • Public Notice US Congress 1789- 2017

    The notice was the type of accountability that harkens back to the first Congress in 1789 which ordered that reports of all of its official acts be placed in three independent newspapers.

    IT REFLECTED THE PUBLIC DISTRUST OF THE NEW GOVERNMENT…

    ————————————————————————

    July 16, 2017 Some things change and some things never change

    Noting that “…the purpose of publication…is to ensure the widest possible dissemination and publicity”  below is a 344 page document.

    Judiciary Act of 1789: Primary Documents of American History (Virtual …

    https://www.loc.gov/rr/program/bib/ourdocs/judiciary.html

    Jump to Library of Congress Web Site – A Century of Lawmaking for a New Nation: U.S. Congressional … The appendix of the Annals of Congress contains a copy of the Judiciary Act of 1789. … SENATE SESSIONS WERE CLOSED TO THE PUBLIC UNTIL 1795. 1789 – A form letter used by Washington in 1789 when appointing …

    —————————————————————————–

    THE JOINT RESOLUTION  OF MARCH 3, 1845

    In 1843, an honorable judge knew, such work was very much needed, and indeed  there would be an occasion to investigate the laws of the United States.

    —————————————————————————

    Letter from the Hon. Judge Sprague,

    District Judge of Massachusetts.

    Boston, December 4, 1843.

    My DEAR SIR: I have examined your plan for an edition of the Statutes of the United States at large, and it meets my cordial approbation.”, SUCH A WORK IS VERY MUCH NEEDED, AND MUST BE OF GREAT UTILITY TO ALL WHO MAY HAVE OCCASION TO INVESTIGATE THE LAWS OF THE UNITED STATES.

     —————————————————————————————–

    THE JOINT RESOLUTION  OF MARCH 3, 1845

    The work will thus become, for all purposes, the PERMANENT NATIONAL EDITION OF THE LAWS OF THE UNITED STATES; and all future statutes treaties may be printed in the same form, and become consecutive volumes of the NATIONAL CODE……

     By a contract with the government of the United States, the plates from which the work is printed belong to the government, to the extent set forth in THE JOINT RESOLUTION  OF

    MARCH 3, 1845; THUS SECURING TO THE UNITED STATES THE USE OF THE PLATES, TO THE END OF TIME; so that all future editions of the statutes and treaties may be printed in the same manner.

     ———————————————————————————

    THE EDITION OF THE STATUTES OF THE UNITED STATES NOW PRESENTED TO THE PUBLIC COMPREHENDS

    ALL THE PUBLIC ACTS PASSED SINCE THE ORGANIZATION OF THE GOVERNMENT,

    PRECEDED BY (“lead the way; occurred before”) THE DECLARATION OF INDEPENDENCE, THE ARTICLES OF CONFEDERATION, AND THE CONSTITUTION OF THE UNITED STATES;

    IN ONE VOLUME, THE PRIVATE ACTS;

    AND IN ONE VOLUME,

    THE TREATIES OF THE UNITED STATES WITH FOREIGN NATIONS AND WITH THE INDIAN TRIBES, WHICH COMPOSE THE WHOLE DIPLOMATIC COLLECTION

    ——————————————–

    The Copious notes of the Decisions of the courts of the United States, which construe,

    comment upon, or apply to the law, treaty, or text, and upon the subjects of the laws,

    which have come under the consideration of the courts, are placed under the acts.

    ———————————————-

    On the margin, or at the foot of the page containing each law, there is a reference

    to the acts passed before or after the law on the same matter.

    The repeal of every law, and its having become obsolete, are also noted. In Notes, the whole legislation on many of the subjects of the laws is fully referred to.

     —————————————————

    The laws are divided so as to comprehend the acts of every session of Congress as a separate statute, designated as the First, Second, or Third statute; with a running title at the head of each page expressing the session of Congress and the date of each chapter or resolve, contained in the page; and each law forms a separate chapter.

    —————————————————

    It will be seen that the acts are inserted in chronological order, but the numbers of the chapters are not consecutive. It was the purpose of the editor to adopt a different arrangement of the chapters,

    BUT THE ATTORNEY-GENERAL OF THE UNITED STATES HAS DECIDED THAT THE “JOINT RESOLUTION” IMPOSES THE MANNER OF CHAPTERING WHICH HAS BEEN PURSUED.

    THE NUMBERS OF THE CHAPTERS OF THE PRIVATE ACTS, ARE THOSE OF THE OMITTED CHAPTERS IN THE VOLUMES OF THE PUBLIC LAWS.

     —————————————-

    Every volume contains a separate alphabetical index of the matters in the volume, in

    which particular reference is given to the subject of every act; and at the end  of

    the last volume of the Public Laws there is an Index of all the matters in the volumes of the Public Laws.

    ————————————————

    THE VOLUME OF PRIVATE LAWS CONTAINS AN INDEX TO THEIR CONTENTS;

    AND TO THE VOLUME CONTAINING THE TREATIES A FULL AND PARTICULAR INDEX IS GIVEN, IN SUCH A FORM AS THAT AN EASY REFERENCE IS OBTAINED TO EVERY PROVISION IN EVERY TREATY.

    VOL.  I.-(2)

    ——————————————————————————–

    The Government of the United States having sanctioned by its liberal patronage this publication, it is confidently believed, that a full and complete knowledge of the statutes and treaties of the United States, and of the decisions of the courts of the United States, construing the laws, and the subjects to which they relate-the administration of public justice and public and private convenience, will be extensively promoted, and permanently secured by this work.

    THE JOINT RESOLUTION  OF MARCH 3, 1845;

    THUS SECURING TO THE UNITED STATES THE USE OF THE PLATES, TO THE END OF TIME.

     ————————————————————————————-

     July 16, 2017  some things never change

    PUBLIC DISTRUST OF THE GOVERNMENT

    —————————————————————–

    And, some things are always changed by the government.

    Indeed, the House of Rep. Law Revision Council

    http://uscode.house.gov/browse/prelim@title8/chapter15&edition=prelim

    CHAPTER 15—ENHANCED BORDER SECURITY AND VISA ENTRY REFORM (sections 1701 to 1778)

    [View]

    The amendments made by this section shall take effect no later than October 1, 2018, and shall be implemented in a manner that ensures the fees collected, transferred, and used in fiscal year 2019 can be readily tracked.

     ————————————————–

    §1715. Consular and Border Security Programs

    (a) Separate fund.—

    There is established in the Treasury a separate fund to be known as the “Consular and Border Security Programs” account into which the following fees shall be deposited for the purposes of the consular and border security programs.

    (b) to (g) Omitted

    (h) Transfer of funds

    (1) The unobligated balances of amounts available from fees referenced under this section may be transferred to the Consular and Border Security Programs account.

    (2) Funds deposited in or transferred to the Consular and Border Security Programs account may be transferred between funds appropriated under the heading “Administration of Foreign Affairs”.

    (3) The transfer authorities in this section shall be in addition to any other transfer authority available to the Department of State.

    (i) Effective date

    The amendments made by this section shall take effect no later than October 1, 2018, and shall be implemented in a manner that ensures the fees collected, transferred, and used in fiscal year 2019 can be readily tracked.

    (Pub. L. 115–31, div. J, title VII, §7081, May 5, 2017, 131 Stat. 716.)

    Codification

    Section is comprised of section 7081 of title VII of div. J of Pub. L. 115–31. Subsecs. (b) and (c) of section 7081 of Pub. L. 115–31 amended sections 1713 and 1714, respectively, of this title. Subsecs. (d) and (e) of section 7081 amended provisions set out as notes under sections 1153 and 1183a, respectively, of this title. Subsec. (f) of section 7081 amended section 214 of Title 8, Aliens and Nationality, and subsec. (g) of section 7081 amended provisions set out as a note under section 214 of Title 8.

    ——————————————————————–

    CHAPTER 15—Front Matter

    [View]

    Sec. 1701. Definitions

    [View]

    SUBCHAPTER I—FUNDING (sections 1711 to 1715)

    [View]

    SUBCHAPTER II—INTERAGENCY INFORMATION SHARING (sections 1721 to 1724)

    [View]

    SUBCHAPTER III—VISA ISSUANCE (sections 1731 to 1738)

    [View]

    SUBCHAPTER IV—INSPECTION AND ADMISSION OF ALIENS (sections 1751 to 1753)

    [View]

    SUBCHAPTER V—FOREIGN STUDENTS AND EXCHANGE VISITORS (sections 1761 to 1762)

    [View]

    SUBCHAPTER VI—MISCELLANEOUS PROVISIONS (sections 1771 to 1778)

    [View]

    ——————————————————

    INDEED, Some things change

    AND, Many, things effecting and affecting  change in the  U.S. government happened between Jun 16, 2015  and July 16, 2017.

    ———————————————————-

    INCLUDING, BUT NOT LIMITED TO,  DAILY PUBLIC NOTICE

    1600 Daily: Everything White House for 7/14/17 | whitehouse.gov

    https://www.whitehouse.gov/1600daily

    1600 Daily: Everything White House for 7/14/17. July 14, 2017 at 11:30 AM ET by 1600Daily. Summary: Get news, events and updates from the White House …


  • WA DOE $50 Comment Recording Fee?

    WA DOE $50 Public Comment Recording Fee?

    1. Protests or objections to approval of this application must include a detailed statement of the basis for objections. 
    2. All letters of protest will become public record. 
    3. Cash shall not be accepted.  Fees must be paid by check or money order and are nonrefundable. 
    4. Protests must be accompanied by a $50 recording fee payable to the Department of Ecology, Cashiering Unit, P.O. Box 47611, Olympia, WA 98504-7611,
    5. within 30 days from June 20, and June 30, 2017.

    —————————————————————————————

    I AM FREELY PROTESTING AND OBJECTING TO THIS $50.00 DOE FEE FOR PUBLIC COMMENT,  AS A MATTER OF PUBLIC RECORD,  ON MY WEBSITE.

    ————————————————————-

    TAKE NOTICE STEVENS COUNTY WE MUST  PROTEST OR OBJECT WITHIN 30 DAYS FROM JUNE 22, 2017.

    ———————————

    TAKE NOTICE GRANT COUNTY WE  MUST PROTEST OR OBJECT  WITHIN THIRTY (30) DAYS FROM JUNE 20, 2017.

    ————————————————————-

    I GOT MY  PUBLIC NOTICE IN A PRIVATE EMAIL ON TUES JULY 11, 2017

    The email said,  So whatever we can pull together ASAP will be helpful. 

    I SUGGEST WE START HERE….

    EMAIL YOUR, OBJECTIONS, COMMENTS AND PROTESTS  REGARDING THE WA STATE DOE WATER RULERS NEW $50 COMMENT RECORDING FEE,  TAKE NOTICE TO YOUR ELECTED REPRESENTATIVE AT ALL LEVELS OF GOVERNMENT, FEDERAL, STATE, COUNTY AND CITY.

    INDEED,  EMAIL  OBJECTIONS, COMMENTS  AND PROTESTS  SENT TO YOUR ELECTED REPRESENTATIVES, ARE LEGALLY RECORDED DOCUMENTATION AND THEY ARE A MATTER OF PUBLIC RECORD. 

    ————————————————————————————

    THIS DOE $50.00 FEE  TO PROTEST OR OBJECTION AND  TO RECORD PUBLIC COMMENT UNDER DOE WATER APPLICATION NO. G3-30736 IS NOT SOMETHING NEW.

     IT’S JUST NEW TO VOTING TAXPAYING CITIZEN WATER USERS.

    ———————————————————————

    HOW WA STATE DUE PROCESS ON PUBLIC NOTIFICATION WORKS, OR NOT?

    Somebody found something, and read something in  the Chewelah Independent, a newspaper in Stevens County WA on June 22nd 2017 that was placed by the Dept. of Ecology. 

    Indeed, I got my PUBLIC NOTICE in a private email on Tuesday, July 11, 2017 8:57 PM

    OBJECTIONS OR PROTESTS COMMENTS WITHIN THIRTY (30) DAYS FROM JUNE 22, 2017.

    WORD GETS AROUND IN CYBERSPACE (eventually)

    I AM FREELY PROTESTING AND OBJECTING TO THIS $50.00 DOE FEE ON PUBLIC COMMENT MY WEBSITE.

     —– Original Message —–

    From: XXX

    To: XXX

    Sent: Tuesday, July 11, 2017 8:57 PM

    Subject: SCPRG Update

    Protests or objections to approval of this application must include a detailed statement of the basis for objections.  All letters of protest will become public record.  Cash shall not be accepted.  Fees must be paid by check or money order and are nonrefundable.  Protests must be accompanied by a $50 recording fee payable to the Department of Ecology, Cashiering Unit, P.O. Box 47611, Olympia, WA 98504-7611, within 30 days from June 20, and June 30, 2017.

    —————————————————————————————-

    WA State DOE From TAXATION TO FEE-DOM

    ——————————————————————————-

    AS IT STOOD ON OCT 26, 2013 , AND AS IT STANDS JULY 12, 2017

    ————————————————————————- 

    OCT 26, 2013 IF THE GOVERNMENT CAN’T FORCE US TO PAY MORE TAXES?

    WHAT CAN THE GOVERNMENT DO TO TAKE MORE MONEY FROM US?

    The bottom line
    REMEMBER A “FEE” IS NOT A TAX
    AND, A TOLL IS JUST A FEE
    AND, A SERVICE IS JUST ANOTHER FEE
    AND, A CHARGE IS JUST ANOTHER FEE
    AND, A FARE IS JUST ANOTHER FEE

    AND, A DOE $50.00 RECORDING FEE IS JUST ANOTHER FEE

    OBJECTIONS OR COMMENTS MUST BE ACCOMPANIED BY A $50 RECORDING FEE PAYABLE TO THE DEPARTMENT OF ECOLOGY, CASHIERING UNIT, P.O. BOX 47611, OLYMPIA, WA 98504-7611, WITHIN 30 DAYS FROM JUNE 22, 2017.

    —————————————————————————–

    STATE OF WASHINGTON DEPARTMENT OF ECOLOGY OFFICE OF COLUMBIA RIVER YAKIMA, WA. NOTICE OF APPLICATION TO APPROPRIATE PUBLIC WATERS TAKE NOTICE: 

    DOE TAKE WATER TAKE NOTICE WITHIN 30 DAYS FROM JUNE 22, 2017.

    Protests or objections to approval of this application must include a detailed statement of the basis for objections.  All letters of protest will become public record.  Cash shall not be accepted.  Fees must be paid by check or money order and are nonrefundable.  Protests must be accompanied by a $50 recording fee payable to the Department of Ecology, Cashiering Unit, P.O. Box 47611, Olympia, WA 98504-7611, WITHIN 30 DAYS FROM JUNE 22, 2017.

    —————————————————————————————–

    GRANT COUNTY WATER CONSERVANCY BOARD AMENDED NOTICE OF APPLICATION FOR CHANGE OF GROUNDWATER CERTIFICATE 399A(A)

    DOE TAKE WATER TAKE NOTICE WITHIN 30 DAYS FROM JUNE 20, 2017.

    Protests must be accompanied by a fifty dollar ($50.00) recording fee and filed with the Cashiering Section, State of Washington, Department of Ecology, P.O. Box 47611, Olympia, Washington 98504-7611 WITHIN THIRTY (30) DAYS FROM JUNE 20, 2017. #06029/86342 Pub: June 13 & 20, 2017

    —————————————————————————

    STATE OF WASHINGTON DEPARTMENT OF ECOLOGY OFFICE OF COLUMBIA RIVER YAKIMA, WA

    NOTICE OF APPLICATION TO APPROPRIATE PUBLIC WATERS TAKE NOTICE:  That STEVENS COUNTY of Colville, WA, on February 11, 2015, under Application No. G3-30736 applied to appropriate public waters, subject to existing rights, from multiple wells in the amount of 3,350 gallons per minute for continuous multiple domestic and industrial supply.

    That source of the proposed appropriation is located with the Colville River Water Resource Inventory Area, Stevens County, Washington.

    Protests or objections to approval of this application must include a detailed statement of the basis for objections.  All letters of protest will become public record.  Cash shall not be accepted.  Fees must be paid by check or money order and are nonrefundable.  Protests must be accompanied by a $50 recording fee payable to the Department of Ecology, Cashiering Unit, P.O. Box 47611, Olympia, WA 98504-7611, within 30 days from June 22, 2017.

    —————————————————————————

    GRANT COUNTY WATER CONSERVANCY BOARD AMENDED NOTICE OF APPLICATION FOR CHANGE OF GROUNDWATER CERTIFICATE 399A(A) TAKE NOTICE: Central Terminals, LLC of Moses Lake has made an APPLICATION FOR CHANGE/TRANSFER of Water Right to add two (2) additional points of withdrawal (POW), for Groundwater Certificate 399A(A). The Board has accepted the applicaiton for active Board review by assigning its number of GRAN-16-10. The Department of Ecology has assigned tracking number CG3-*01104C(A)@2 to this application. That Ground Water Certificate 399A(A) with a priority date of April 18, 1949 has current authorization for 800.0 gallons per minute, 296.1 acre-feet per year, for Continuous Industrial use.

    The current authorized point of withdrawal is located within the NW1/4SW1/4 Section 20, T19N., R29E., W.M., The proposed additional points of withdrawal will be one (1) existing well located within the NW1/4SE1/4 of section 20, T19N., R29E. W.M., and one (1) new well located within the NE1/4NE/4 of Section 29, T19N, R29E. W.M.

    Any interested party may submit comments, objections, and other information to the Board regarding this application. The comments and information may be submitted in writing or verbally at any public meeting of the Board held to discuss or decide on the application. Additionally, the Board will consider written comments or information provided within thirty (30) days from the last date of publication of this notice, said written comments or information to be provided to its office located at 2145 Basin Street SW, Ephrata, WA 98823. Any protests or objections to the approval of this application may be filed with the Department of Ecology and must include a detailed statement of the basis for objections.

     Protests must be accompanied by a fifty dollar ($50.00) recording fee and filed with the Cashiering Section, State of Washington, Department of Ecology, P.O. Box 47611, Olympia, Washington 98504-7611 WITHIN THIRTY (30) DAYS FROM JUNE 20, 2017. #06029/86342 PUB: JUNE 13 & 20, 2017

    ————————————————————————-

    WA State taxes TAXATION from our elected representative

    DOE FEE INCREASES DO NOT HAVE TO BE APPROVED BY THE LEGISLATURE.

    AS IT STOOD ON OCT 26, 2013 , AND AS IT STANDS JULY 12, 2017

    ELECTIONS DO CREATE  OUR LEGISLATORS’

    ————————————————————————- 

    Behind My Back | Fee Fie Foe Fum

    www.behindmyback.org/2013/10/26/fee-fie-foe-fum/

    Oct 26, 2013 – http://en.wikipedia.org/wiki/Feefie-foefum. THERE’S LITTLE REASON EVER TO USE IT? This entry was posted in By Hook or By Crook, …

     OCT 26, 2013 IF THE GOVERNMENT CAN’T FORCE US TO PAY MORE TAXES?

    WHAT CAN THE GOVERNMENT DO TO TAKE MORE MONEY FROM US?

    The bottom line
    REMEMBER A “FEE” IS NOT A TAX
    AND, A TOLL IS JUST A FEE
    AND, A SERVICE IS JUST ANOTHER FEE
    AND, A CHARGE IS JUST ANOTHER FEE
    AND, A FARE IS JUST ANOTHER FEE

    AND, A DOE $50.00 RECORDING FEE IS JUST ANOTHER FEE

    WA STATE FROM TAXATION TO DOE FEE-DOM

    —————————————————————————————-

    Clallam County citizens  sent in over a thousand objections  on The DOE Dungeness Water Rule and the DOE sent us 500 pages of too bad so sad.

    —————————————————————

    VENGEANCE IS MINE SAITH THE WA STATE DEPARTMENT OF ECOLOGY (DOE)

    —————————————————————————–

    VENGEANCE IS MINE SAITH WA STATE VOTERS COME ELECTION TIME


  • The We’s Who Wanted 1743-2017

    “THESE GUYS, “THE MONARCHS OF MONEY”  ARE REALLY MORE POWERFUL THAN THE GOVERNMENT.”

    1788 Thomas Jefferson to the Commissioners of the Treasury, What is to hinder them from creating a perpetual debt?

    DURING OBAMA’S EIGHT YEARS AS PRESIDENT, HE AND HIS PROGRESSIVE DEMOCRAT’S  ADDED $7,917,000,000,000.00  TRILLION DOLLARS TO THE NATIONAL DEBT.

    Nov 8, 2016 American voters answered the 228 year old question, what is to hinder them?

    President Donald J. Trump

    ———————————————————————-

    Apr 29, 2013 THIS BRIEF DOCUMENTARY SHOULD OPEN A FEW EYES TO THE REALITY BEHIND THE WORLD’S MOST POWERFUL (AND REAL) CABAL.

    “Can you imagine if the American public knew there was this ‘club’  that  met every month secretly in Switzerland and made decisions that dramatically affected their lives, but we’re not going to tell you about it because it’s too complicated.”

    CBC documentary “The Monarchs of Money” airing on The National …

    www.bankofcanada.ca › Press › Interviews Bank of Canada Apr 29, 2013… The world’s central banks have printed unimaginable amounts of money in recent years. Neil Macdonald explores what this means for the global economy and for your financial well-being…

    “THE MONARCHS OF MONEY”  Euro-Banking conspiracy to control the United States currency has been going on  for a very, very long time.

    FIRST,  “Give me control over a nation’s currency, and I care not who makes its laws.” MAYER AMSCHEL ROTHSCHILD  quote exact date unknown (1743-1812)

    ——————————————————————————————

    In 1790 Thomas Jefferson knew, he watched  and he weighed in and argued that the United States needed a publicly-owned central bank so that “EUROPEAN MONARCHS” and aristocrats could not use the printing of money to control the affairs of the new nation.

    1800 Thomas Jefferson  A debt of an hundred millions, growing by USURIOUS interest, and an artificial paper phalanx, overruling the agricultural mass of our country have a PORTENTOUS aspect. (Letter to Samuel Adams, 1800)

    Added for clarity, USURIOUS, charging illegal or exorbitant rates of interest for the use of money: a USURIOUS  moneylender. “PORTENTOUS SIGNS” ominous, warning, premonitory, threatening, menacing, ill-omened, foreboding, inauspicious, unfavorable.

    1816 Thomas Jefferson  I place economy among the first and most important of republican virtues, and public debt as the greatest of the dangers to be feared. (Letter to Governor Plumber, 1816)

    ————————————————————————

    1988 Donald J. Trump, a young American business man, had been  watching for years and weighed in on Oprah Winfred’s 1988 show.  

    Simply put, by  2015 the National debt was headed for $20,000,000,000,000.00 TRILLION DOLLARS, things got so bad Donald J. Trump a billionaire business man  ran for president.

     JUL 7, 2016 (200 YEARS LATER)

    ECONOMY AND TERRORISM WERE THE TOP ISSUES FOR VOTERS IN 2016

    AMONG TRUMP SUPPORTERS, 90% CALL THE ECONOMY VERY IMPORTANT TO THEIR VOTE AND …

    TRUMP PLACED THE ECONOMY AMONG THE FIRST AND MOST IMPORTANT ISSUES.

    As Thomas Jefferson said,  We must make our election between economy and liberty, or profusion and servitude, If we run into such debts, as that we must be taxed in our meat and in our drink, in our necessaries and our comforts, in our labors and our amusements, for our callings and our creeds, Our people,  as the people of England are , must come to labor sixteen hours in the twenty-four,

    GIVE THE EARNINGS OF FIFTEEN OF THESE TO THE GOVERNMENT FOR THEIR DEBTS AND DAILY EXPENSES; and the sixteenth being insufficient to afford us bread.  have no time to think, no means of calling the mismanagers to account….

    ————————————————————————–

    1788  Thomas Jefferson asked… What is to hinder them (the European Monarchs) from creating a perpetual debt?

    It was just a matter of time and computer technology,  In 1954 it was well recognized by those in positions of authority that it was only a matter of time, only a few decades, before the general public would be able to grasp and upset the cradle of power, for the very elements of the new silent weapon TECHNOLOGY WERE AS ACCESSIBLE for a public utopia as they were for providing a private utopia. IT WAS JUST A MATTER OF TIME BEFORE THE GENERAL PUBLIC WOULD BE ABLE TO GRASP AND UPSET THE CRADLE OF POWER

    NOV 8, 2016 American voters made the election ECONOMY AND LIBERTY

    DONALD J. TRUMP WAS ELECTED PRESIDENT OF THE UNITED STATES OF AMERICA

    AND WOW, AND HOW, IT DID, UPSET THE GLOBAL CRADLE OF POWER

    ————————————————————————

    Read more here,  it was just a matter of time and technology

    Behind My Back | Just a Matter of Time and Money 1790-2016

    www.behindmyback.org/2016/04/28/just-a-matter-of-time-and-money-1790-2016/

    Apr 28, 2016just a matter of time and foreign money 1790-2016 1790 get first all the people’s money, then all their lands and …

    —————————————————————————

    And more here on Thomas Jefferson

    Behind My Back | Perpetual Debt of the Dead

    www.behindmyback.org/2014/05/17/perpetual-debt-of-the-dead/

    May 17, 2014How much Perpetual Debt of the Dead on May 17, 2014? … Read more at http://famguardian.org/Subjects/Politics/thomasjefferson/jeff1340.htm.

    May 17, 2014  indeed a “portentous sign$17,475,637,718,124.28 TRILLION DOLLAR DEBT, growing by usurious interest,  overruling the agricultural mass of our country.

    The 2014 United States Democrat Congress does hereby bequeath, to all future generations of American Citizens, “The Perpetual Debt of the Dead”.

    ————————————————————————————–

    DURING OBAMA’S EIGHT YEARS AS PRESIDENT, HE AND HIS DEMOCRAT’S  ADDED $7,917,000,000,000.00  TRILLION DOLLARS TO THE NATIONAL DEBT.

    1788  Thomas Jefferson asked… What is to hinder them from creating a perpetual debt?

    Nov 8, 2016 American voters answered the 228 year old question, what is to hinder them?

    President Donald J. Trump

    ——————————————————————————-

    What’s Next?

    UNDERSTANDING THE HISTORY, GOALS AND ACTIONS OF THE NEW WORLD ORDER.

    Learn how the Anglo-American banking elite were able to secretly establish and maintain their global power.

    Carroll Quigley  quote “it is this power structure which the radical right in the United States has been attacking for years in the belief that they are attacking the communists.”

    Historian Carroll Quigley wrote in his epic book Tragedy and Hope Tragedy & Hope History of the World in Our Time by Carroll Quigley IS THE ULTIMATE INSIDER ADMISSION OF A SECRET GLOBAL ELITE THAT HAS IMPACTED NEARLY EVERY MODERN HISTORICAL EVENT. Learn how the Anglo-American banking elite were able to secretly establish and maintain their global power.

    Tragedy & Hope is Carroll Quigley definitive work on the world’s power structure and an essential source material FOR UNDERSTANDING THE HISTORY, GOALS AND ACTIONS OF THE NEW WORLD ORDER.

    Carroll Quigley – Wikipedia

    https://en.wikipedia.org/wiki/Carroll_Quigley

    Carroll Quigley was an American historian and theorist of the evolution of civilizations. He is noted for his teaching work as a professor at Georgetown University, …

    Life and career · Influence on Bill Clinton · Quigley and the Round Table group

     YEP, AND HOW! PROFESSOR QUIGLEY  INFLUENCED BILL CLINTON


  • July 4, 2017 Still Waving over my Hometown

    I received a beautiful picture of the American flag waving over my home town.

    I  am sharing this with you on my website, as a proud, patriotic American grandmother, my grandson Josh took the picture, and he shared it.

    Indeed on, July 4, 2017,  Independence Day, Old Glory will Still be Waving over my Hometown, Port Angeles WA USA.

    joni howard: Picture of PA Josh took
    View photo

    https://photos.google.com/share/AF1QipNTyViZc9uFv6ME5dGwP2iTjpNdvLS64EbL1KO9owOsvRWzBHZypMtEWD8GRFPswg?key=RmY0UmJUbVhqQnVfQXVIR1BhQU1YWXNOTjdmZ0Rn

    On your social media, face book, please share my picture and your picture of  the American flag, Old Glory “STILL WAVING OVER YOUR HOMETOWN”.

    This video is worth 10,000 words

    All American Citizens need to be reminded…..

    My Name Is Old Glory – YouTube

    ▶ 2:52

    https://www.youtube.com/watch?v=rUqLAIsybTk

    Sep 30, 2013 – Uploaded by DeRon Johnson

    My Name Is Old Glory I am the flag of the United States of America My … By far this is my most favorite poem of …

    I stand with President Trump. “I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.”

    The pledge of allegiance to the flag  is my American heritage, it was originally published in The Youth’s Companion on September 8, 1892.

    ———————————————————-

    The National Anthem? The Star Spangled Banner?

    1814, WAS INSPIRED BY THE SIGHT OF THE AMERICAN FLAG STILL FLYING OVER  Fort McHenry after a night of heavy British bombardment.

    July 4, 2017 this, my Independence Day posting WAS INSPIRED BY THE SIGHT OF THE AMERICAN FLAG STILL WAVING OVER MY HOMETOWN PORT ANGELES WA USA. after months of heavy bombardment on President Trump,  by the politico establishment, democrat’s and the liberal news media.

    Be Inspired, On your social media, face book  please share my picture and your pictures of  the American flag, Old Glory “STILL WAVING OVER OUR HOMETOWNS”.

    July 4, 2017, Where does that star-spangled banner yet wave
    O’er the land of the free and the home of the brave?

    ———————————————————————

    The Old Glory video above is worth 10,000 words

    full unedited text

    My name is Old Glory

    I am the flag of the United States of America
    My name is Old Glory.

    I fly atop the world’s tallest buildings.
    I stand watch in America’s halls of justice.
    I fly majestically over great institutes of learning.
    I stand guard with the greatest military power in the world.
    Look up! And see me!

    I stand for peace, honor, truth, and justice.
    I stand for freedom.
    I am confident . . . I am arrogant.
    I am proud.

    When I am flown with my fellow banners,
    my head is a little higher,
    my colors a little truer.

    I bow to no one.
    I am recognized all over the world.
    I am worshipped.
    I am saluted.
    I am respected.
    I am revered. I am loved.
    And I am feared.

    I have fought every battle of every war for more than 200 years…
    Gettysburg, Shilo, Appomatox, San Juan Hill, the trenches of France,
    the Argonne Forest, Anzio, Rome, the beaches of Normandy,
    the deserts of Africa, the cane fields of the Philippines,
    the rice paddies and jungles of Guam, Okinawa, Japan, Korea, Vietnam,
    and a score of places long forgotten by all but those who were with me.

    I was there!

    I led my soldiers.
    I followed them.
    I watched over them…
    They loved me.

    I was dirty, battle-worn and tired,
    but my soldiers cheered me,
    and I was proud.

    I have been soiled, burned, torn and trampled on the streets of countries
    I have helped set free.
    It does not hurt . . . for I am invincible.
    I have been soiled, burned, torn and trampled on the streets of my country,
    and when it is by those with whom I have served in battle . . . it hurts.
    But I shall overcome . . . for I am strong.

    I have slipped the bonds of Earth
    and stand watch over the uncharted new frontiers of space
    from my vantage point on the moon.

    I have been a silent witness to all of America’s finest hours.
    But my finest hour comes
    when I am torn into strips to be used for bandages
    for my wounded comrades on the field of battle.
    when I fly at half mast to honor my soldiers…
    and when I lie in the trembling arms
    of a grieving mother at the graveside of her fallen son.

    I am proud.
    My name is Old Glory.
    Dear God . . . Long may I wave!

    —————————————————–

    USA national anthem (with lyrics) – YouTube

    ▶ 2:05

    https://www.youtube.com/watch?v=PK7xF1RGCQY

    Oct 17, 2008 – Uploaded by CortezFL

    Carmelo33: http://www.youtube.com/user/Carmelo33 Oh, say, can you see, by the dawn’s early light

    ———————————————

     The U.S. National Anthem

    “The Star Spangled Banner”, was ordered played at military and naval occasions by President Woodrow Wilson in 1916, but was not designated the national anthem by an Act of Congress until 1931.

    The words were written in 1814 by Francis Scott Key, who had been inspired by the sight of the American flag still flying over Fort McHenry after a night of heavy British bombardment. The text was immediately set to a popular melody of the time, “To Anacreon in Heaven.”

    The National Anthem consists of four verses. On almost every occasion only the first verse is sung.

    HAVE YOU EVER READ ALL FOUR VERSES?

    Oh, say can you see by the dawn’s early light
    What so proudly we hailed at the twilight’s last gleaming?
    Whose broad stripes and bright stars thru the perilous fight,
    O’er the ramparts we watched were so gallantly streaming?
    And the rockets’ red glare, the bombs bursting in air,
    Gave proof through the night that our flag was still there.
    Oh, say does that star-spangled banner yet wave
    O’er the land of the free and the home of the brave?

    On the shore, dimly seen through the mists of the deep,
    Where the foe’s haughty host in dread silence reposes,
    What is that which the breeze, o’er the towering steep,
    As it fitfully blows, half conceals, half discloses?
    Now it catches the gleam of the morning’s first beam,
    In full glory reflected now shines in the stream:
    ‘Tis the star-spangled banner! Oh long may it wave
    O’er the land of the free and the home of the brave.

    And where is that band who so vauntingly swore
    That the havoc of war and the battle’s confusion,
    A home and a country should leave us no more!
    Their blood has washed out their foul footsteps’ pollution.
    No refuge could save the hireling and slave’
    From the terror of flight and the gloom of the grave:
    And the star-spangled banner in triumph doth wave
    O’er the land of the free and the home of the brave.

    Oh! thus be it ever, when freemen shall stand
    Between their loved home and the war’s desolation!
    Blest with victory and peace, may the heav’n rescued land
    Praise the Power that hath made and preserved us a nation.
    Then conquer we must, when our cause it is just,
    And this be our motto: “In God is our trust.”
    And the star-spangled banner in triumph shall wave
    O’er the land of the free and the home of the brave.

    ————————————————————————-

    “In God we trust.”

    Long may Old Glory wave!

    O’er the land of the free and the home of the brave.

    Amen


  • June 20, 2017 Clallam County SMP Update

    My public comment

    Vested Clallam County Citizens have been fearful of how the SMP Update will affect their private property use since Jan 26, 2011.

    INDEED, THIS IS NOT ABOUT PROTECTING SHORE LANDS, WETLANDS, ANIMALS OR RIVERS. THIS IS ABOUT CONTROLLING PEOPLE AND THEIR PRIVATE PROPERTY.  I WISH PEOPLE WOULD WAKE UP TO WHAT IS TAKING PLACE IN THIS COUNTRY, STATE AND COUNTY  WITH REGARDS TO CENTRAL GOVERNMENT CONTROLLING LAND AND IMPOSING HEAVY REGULATIONS ON ALL PRIVATE PROPERTY.

    I received a phone call from a concerned (fearful) Clallam County citizen last night.

    “Pearl, have you read the new SMP Update Draft? Do you know how Steve Grey and (ESA Consultant) Margaret Clancy have changed it? Do you know what’s in it?”

    We talked for over an hour. My understanding of the most outrageous concerns.

    There shall be 200 foot setbacks based on a concocted 100 year plan?  Clallam County SMP Update Requirements prior to any permitted use of private shoreline property shall include, but not limited to,  up to $20,000.00 in …….

    Geotechnical Engineering

    www.whatisgeotech.org/

    IT INCLUDES, WITHOUT BEING LIMITED TO, the analysis, design and construction of foundations, slopes, retaining structures, embankments, roadways, tunnels, levees, wharves, landfills and other systems that are made of or are supported by soil or rock. Geotechnical Societies by Country.

    ———————————————————-

    The concerned citizen said, Pearl, what are you going to do about this? You have private shoreline property that will be seriously affected.

    IN CLALLAM COUNTY WA, THERE ARE 3300 VESTED SHORELINE PRIVATE PROPERTY  OWNERS THAT SHALL BE SERIOUSLY AFFECTED BY THE OUTRAGEOUS RESTRICTIONS IMPOSED BY SMP UPDATE, I AM JUST ONE OF THEM.

    THE REAL QUESTION IS WHAT ARE OUR ELECTED REPRESENTATIVES GOING TO DO ABOUT IT?

    THEY HAVE VOTERS, INCLUDING, BUT NOT LIMITED TO THOSE AFFECTED BY THE SMP UPDATE, THAT FEEL VIOLATED BY THE RESTRICTED USE OF THEIR PRIVATE PROPERTY IN CLALLAM COUNTY.

    ———————————————————————–

    INDEED, BUT EVEN MORE TO THE POINT, what business does the government have telling a man whether or not he can plow or not on his own land?  This is not about wetlands and animals or rivers.  This is about controlling people and their property.  I wish people would wake up to what is taking place in this country with regards to central government controlling land and imposing heavy regulations on private property.

    —————————————————————

    Farmer Faces $2.8 Million Fine for… Plowing His Field! – Freedom …

    freedomoutpost.com/farmer-faces-2-8-million-fine-for-plowing-his-field/

    May 26, 2017 – A California farmer is facing $2.8 million in fines for plowing his field and planting wheat without a permit. John Duarte of Duarte Nursery is …

    Tim BrownMay 26, 2017

    A California farmer is facing $2.8 million in fines for plowing his field and planting wheat without a permit.

    John Duarte of Duarte Nursery is David going up against Goliath, just like ranchers, farmers and natural health product makers.  His case could set a dangerous precedent that would require farmers to obtain expensive and time-consuming permits from the US Army of Corps Engineers before planting crops.

    “The case is the first time that we’re aware of that says you need to get a (U.S. Army Corps of Engineers) permit to plow to grow crops,” said Anthony Francois, a lawyer for the Pacific Legal Foundation. “We’re not going to produce much food under those kinds of regulations.”

    However, U.S. District Judge Kimberly J. Mueller sided with the Army Corps last June, in which the US Attorney’s Office is asking for $2.8 million in civil penalties.

    Why?  Who was harmed?  What real and actual crime took place?

    USA Today has the background of the story that began in 2012 when Mr. Duarte planted wheat on land that he bought with his own money, some 450 acres.

    Because the property has numerous swales and wetlands, Duarte hired a consulting firm to map out areas on the property that were not to be plowed because they were part of the drainage for Coyote and Oat creeks and were considered “waters of the United States.”

    Francois conceded that some of the wetlands were plowed but not significantly damaged. He said the ground was plowed to a depth of 4 to 7 inches.

    The Army Corps did not claim Duarte violated the Endangered Species Act by destroying fairy shrimp or their habitat, Francois said.

    This particular freshwater species is unique to California and southern Oregon and has been classified as a threatened species since 1994 because much of its wetlands in California’s Central Valley were converted to cropland or became urban.

    Duarte’s wheat was planted but not harvested because in February 2013 the Army Corps of Engineers and the California Central Valley Regional Water Quality Control Board issued orders to stop work at the site. The agencies claimed Duarte had violated the Clean Water Act by not obtaining a permit to discharge dredged or fill material into seasonal wetlands considered waters of the United States.

    Duarte sued the Army Corps and the state, alleging they violated his constitutional right of due process by issuing the cease and desist orders without a hearing. The U.S. Attorney’s Office counter-sued Duarte Nursery tto enforce the Clean Water Act violation.

    Farmers plowing their fields are specifically exempt from the Clean Water Act rules forbidding discharging material into U.S. waters, Francois said.

    The government claims that Duarte did not plow but rather used a ripper, which dug 10 inches into the soil and they allege that it disturbed portions of the property that included wetland areas.

    “Even under the farming exemption, a discharge of dredged or fill material incidental to the farming activities that impairs the flow of the waters of the United States still requires a permit because it changes the chemical, physical and biological integrity of the waters,” the U.S. attorney said in court filings.

    Francois claims the penalties are unfair because his client believed the plowing exemption allowed him to till the soil.

    “A plain reading of the rules says you don’t need a permit to do what he did,” Francois said. “How do you impose a multimillion penalty on someone for thinking the law says what it says?”

    Indeed, but even more to the point, what business does the government have telling a man whether or not he can plow or not on his own land?  This is not about wetlands and animals or rivers.  This is about controlling people and their property.  I wish people would wake up to what is taking place in this country with regards to central government controlling land and imposing heavy regulations on private property.

    ——————

    The bottom line…

    WHAT AM I GOING TO DO ABOUT IT?

    Just saying, To Local Elected Representatives..

    Changes are taking place in WA DC.

    Don’t lock yourself up by imposing restricted use on Private Property that you can’t defend and uphold in a court of law.


  • 2012 SMP Issues Left on the Table

    June 9, 2017  My Updated Public Comment  CLALLAM COUNTY WA SMP

    Subject: SMP PUBLIC COMMENT JULY 14, 2012  ON THE SMP Advisory Committee

    THE PREVIOUS CONDUCT OF THE PARTIES

    July 10, 2012 the 19 SMP Issues left on the table by the Clallam County SMP (citizens?) Advisory Committee.

    Two thirds or more of the SMP (citizens?) Advisory Committee VOTED TO WALK  AWAY FROM THE TABLE,

    LEAVING 19 OR MORE PROPOSED SMP DRAFT ISSUES RELATED TO THE DOE SMP TAKING OF PRIVATE PROPERTY WITHOUT ARGUMENT, SUGGESTIONS OR COMMENT?

    INDEED, THE INTENT OF A PARTY CAN BE DETERMINED BY EXAMINING THE UNDERSTANDING OF A REASONABLE PERSON, AFTER CONSIDERATION IS GIVEN TO ALL RELEVANT CIRCUMSTANCES OF THE CASE INCLUDING THE NEGOTIATIONS, ANY PRACTICES THE PARTIES HAVE ESTABLISHED BETWEEN THEMSELVES, USAGES AND ANY SUBSEQUENT CONDUCT OF THE PARTIES.

    ———————————————————–

    The 19 SMP Update unresolved issues left on the table, At the July 10, 2012 SMP Committee Advisory meeting, Against my suggestion that we needed an additional August meeting to complete our duty to the citizens and private property owners, as SMP advisors, prior to the final SMP draft proposal being written.

    If any of you read this complete July 14, 2012 comment? You understand fully, why I am critical of the two thirds majority of the Advisory Committee members that failed to complete their responsibility to the citizens and private property owners of Clallam County, prior to the 2017 final SMP Draft Proposal, being given to the Clallam County Planning Commission.

    July 10, 2012 The last remark Steve Gray made to me, nearly five years ago was “I just want to get this over with.” 

    ————————————————————

    SUBSEQUENT CONDUCT OF THE PARTIES.

    SMP Cumulative Impact on People

    Posted on November 18, 2014 10:35 am by Pearl Rains Hewett

    This is my Clallam County SMP Public comment and objection

    Pearl Rains Hewett

    ———————————————————-

    SUBSEQUENT CONDUCT OF THE PARTIES.

    Clallam County Shoreline Master Program (SMP) – New Revised SMP Draft (June 2017)

    —– Original Message —–

    From: zSMP
    Sent: Friday, June 02, 2017 4:39 PM
    Subject: FW: Clallam County Shoreline Master Program (SMP) – New Revised SMP Draft (June 2017)

    Interested Parties,

    You are receiving this email because you are on the Clallam County Shoreline Master Program (SMP) Update email notification list.  The County Department of Community Development (DCD) has just released a Revised SMP Draft (June 2017). 

    An “INTERESTED PARTY SINCE JAN 26, 2011?” concerned, vested, voting, Clallam County private shoreline property owner and member of SMP Update (citizens) Advisory Committee.

    —– Original Message —–

    Saturday, July 14, 2012 3:13 PM

    THE REST OF THE STORY…….

    THE PREVIOUS CONDUCT OF THE PARTIES.

    From: pearl hewett

    to  zSMP

    Cc: several

    Sent: Saturday, July 14, 2012 3:13 PM

    Subject: SMP COMMENT #292 ON THE SMP Advisory Committee

    This is my full comment on the SMP Advisory Committee

    Pearl Rains Hewett Trustee

    George C. Rains Estate

    Concerned Member SMP Advisory Committee

    At the July 10, 2012 SMP Committee Advisory meeting

    Two thirds or more of the SMP Advisory Committee

    VOTED TO WALK  AWAY FROM THE TABLE,

    against my suggestion that we needed an additional August meeting to complete our duty to the citizens and private property owners, as SMP advisors, prior to the final SMP draft proposal being written.

    The SMP Advisory Committee that  represent the 3300 Clallam County shoreline private property owners is approximately as follows.

    1/3 = 10 private interest groups

    1/3 = 10 paid government employees

    1/3 = 10 SMP Affected taxpaying private property owners (only 8 at this meeting)

    DOES THE MAKEUP OF THIS COMMITTEE EXPLAINS WHY?

    THEY VOTED TO WALK  AWAY FROM THE TABLE

    LEAVING 19 OR MORE PROPOSED SMP DRAFT ISSUES RELATED TO THE DOE SMP TAKING OF PRIVATE PROPERTY without argument, suggestions or comment?

    (1) DISCUSSED AND QUESTIONED? The undecipherable table with the percentages, the 15% of whatever? It made no sense to me either? One vested citizen, could help with  his knowledge of what he thought it actually was/represented? It would be very helpful to members of the committee.

    The written text related to the undecipherable table below

    1. Minor new development Grading shall not exceed 500 cubic yards; and ii. Land disturbing activities shall not exceed 20,000 square feet, except that on parcels less than five (5) acres, land disturbing activities must not exceed fifteen (15) percent of the gross parcel size; and iii. The total cumulative footprint of all structures on a parcel must be less than 4,000 square feet; and iv. The total cumulative impervious surface area on the parcel must be less than ten (10) . All land disturbing activities must be located on slopes less than fifteen (15) percent; and vi. All land disturbing activities must comply with any critical area buffer and other protection standards established for parcels created by land division.

    ————————————————————————

    (2) DISCUSSED AND QUESTIONED? NOT ADDRESSED

    The limited number of trained specialists,  Engineer’s  comment was in reference to the county SMP  requiring specialists, to perform the mitigation tests. If a property owner could even find one to do the testing? The time delay and cost would be prohibitive.

    ——————————————————————-

    (3) PRESENTED NOT DISCUSSED

    SMP Excessive restrictions on all forms of developments. I am extremely concerned about the additional restrictive requirements written into the SMP update for major development. They are counter- productive to the economic recovery of Clallam County, they restrict the ability of business and citizens to create employment opportunities in both Clallam County and Port Angeles. Why are the Dept. of Community Development and the planning biting off their own feet? Why are they creating these obsessive restrictions on all developments?

    The way Steve was talking it, with all the added bells and whistles, it was to make any form of mitigation for anything totally infeasible, creating a like it or lump it, situation for all development by business or private shoreline property owners.

    ———————————————————————

    (4) PRESENTED- DISCUSSED but NOT ADDRESSED

    The cumulative effect of setbacks SHORELINE, WETLAND and HABITAT   one citizen did a good job when he pointed out an example of the enormous  loss of private property use with the setbacks on Lake Pleasant, in conjunction with the yet undetermined, Clallam County DOE designated WETLANDS.

    ———————————————————————–

     (5) PRESENTED NOT ADDRESSED

    More additional HABITAT setbacks

    IT WAS IMPRESSIVE HOW SMOOTHLY MARGARET AND STEVE JUST ADDED ON THE ADDITIONAL HABITAT SETBACKS, BUT DID NOT MENTION ENDANGERED SPECIES.

    1. Rare, endangered, threatened and sensitive species means plant and animal species identified and listed by the Washington State Department of Natural Resources, Washington Natural Heritage Program, Washington State Department of Fish and Wildlife, or the U.S. Fish and Wildlife Service, as being severely limited or threatened with extinction within their native ranges.
    2. Threatened species means a species that is likely to become an endangered species within the foreseeable future, as classified by the Washington Department of Fish and Wildlife, the Department of Natural Resources, Washington Natural Heritage Program, or the federal Endangered Species Act.

    ————————————————————————-

     

    (6)  COMMENT NOT ADDRESSED

    1. Recording means the filing of a document(s) for recordation with the County auditor.

    ————————————————————————————

    (7) NO DISCUSSION OR RESOLUTION (not required by law)

    1. Restoration means the reestablishment or upgrading of impaired ecological shoreline processes or functions. This may be accomplished through measures including, but not limited to, revegetation, removal of fill, removal of intrusive shoreline structures and removal or treatment of toxic materials. Restoration does not imply a requirement for returning the shoreline area to aboriginal or pre-European settlement conditions.

    ————————————————————————————

    (8) DOE DESIGNATED WETLANDS NOT IDENTIFIED OR INCORPORATED

    Wetlands have no boundaries, adjoining wetlands could restrict the use of your property.

    1. Wetlands means areas that are inundated or saturated by surface water or ground water at a frequency and duration sufficient to support, and that under normal circumstances support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs and similar areas. Wetlands do not include those artificial wetlands intentionally created for non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands created as mitigation and wetland modified for approved land use activities shall be considered as regulated wetlands.

    PROHIBITED EXCEPTION DISCUSSED AND RESOLVED BY RCW

    Provisions for protection SHALL be included in SMP up date.

    1. Revetment means a sloped wall constructed of rip-rap or other suitable material placed on stream banks or other shorelines to retard bank erosion and minimize lateral stream movement.
    2. Rip-rap means dense, hard, angular rock free from cracks or other defects conductive to weathering often used for bulkheads, revetments or similar slope/bank stabilization purposes.

    ————————————————————————-

    (9) DISCUSSED UNDEFINED NO RESOLUTION [insert final date]

    3.1.1 Shoreline Environment Designations

    1. A shoreline environment designation has been assigned to each segment of the shoreline in accordance with this section. The designations are based on the following general factors:
    2. The ecological functions and processes that characterize the shoreline, together with the degree of human alteration as determined by the [insert final date] Shoreline Inventory and Characterization Report and subsequent technical analyses; and

    ——————————————————————

    (10) NOT PRESENTED OR  DISCUSSED

     EXPENSE OF SPECIALISTS FOR APPROVAL

    1. c. Hazard Tree Removal: Removal of a hazard tree may be allowed in the buffer when trimming is not sufficient to address the hazard. Where the hazard is not immediately apparent to the Administrator, the hazard tree determination SHALL be made after Administrator review of a report prepared by a qualified arborist or forester.

    ——————————————————————–

    (11) NOT PRESENTED OR  DISCUSSED

    EXPENSE OF SPECIALISTS FOR APPROVAL

    1. Invasive Species Management: Removing invasive, non-native shoreline vegetation listed on the Clallam County Noxious Weed List may be allowed in the buffer when otherwise consistent with this Program. The disturbed areas must be promptly revegetated using species native to western Washington. The Administrator SHALL require a vegetation management plan prepared by a qualified ecologist, forester, arborist, or landscape architect prior to approving the invasive species removal. The vegetation management plan SHALL  identify and describe the location and extent of vegetation management. For properties within designated landslide or erosion hazard areas, the Administrator may require review of the vegetation management plan by an engineering geologist or geotechnical engineer to ensure that the vegetation management will not cause or exacerbate hazards associated with soil or slope instability. The location and size of the invasive species management area SHALL be clearly defined on the site plan

    ———————————————————————–

    (12) NOT DISCUSSED – ADDRESSED OR RESOLVED

    Taking of Value of view property by limited 20% KEYHOLE view corridor. If 50% of the value of your shoreline property is for the view? Losing 80% the view value will affect the true and real value of your property

    4.2.4 Regulations – Shoreline Buffers

    . 3. Buffer Condition: Shoreline buffers shall be maintained in a predominantly well vegetated and undisturbed condition to ensure that the buffer provides desired buffer functions including shade, habitat, organic inputs, large woody debris, slope stability, water storage, biofiltration, contaminant removal, and fine sediment control. Up to eighty percent (80%) of the buffer area shall be vegetated with native trees and shrubs. The remaining twenty percent (20%), or at least fifteen (15) linear feet of the water frontage, whichever is greater, may be retained as lawn for active use.

    1. Allowed Uses and Buffer Modifications: The Administrator may allow limited clearing, thinning, and/or pruning to accommodate specific shoreline buffer uses and modifications identified in this section. Such allowances shall not require compensatory mitigation provided that the amount and extent of the clearing, limbing, and/or pruning are the minimum necessary to accommodate the allowed use and all other requirements of the Program are met:

    —————————————————————————–

    (13) view corridor NOT DISCUSSED OR ADDRESSED limited and selective tree removal, pruning, and/or limbing in the buffer

    1. View Corridors: The Administrator may allow limited and selective tree removal, pruning, and/or limbing in the buffer to create a view of the shoreline when otherwise consistent with this Program. The removal, pruning, and/or limbing shall not require any ground-disturbing equipment and shall not materially alter soils or topography.

    ————————————————————————-

    (15) NOT DISCUSSED OR ADDRESSED

    EXPENSE OF SPECIALISTS FOR APPROVAL

    Administrator shall require a view clearance plan

    The Administrator shall require a view clearance plan prepared by a qualified ecologist, forester, arborist, or landscape architect prior to approving the view corridor. The view clearance plan shall identify and describe the location and extent of the proposed tree removal, pruning, and limbing and shall demonstrate compliance with American National Standards Institute (ANSI) A300 Standards for Tree Care Operations (Tree, Shrub, and Other Woody Plant Management – Standard Practices). For properties within designated landslide or erosion hazard areas, the Administrator may require review of the view clearance plan by an engineering geologist or geotechnical engineer to ensure that the proposed removal, pruning, and/or limbing will not cause or exacerbate hazards associated with soil or slope instability. The location and size of the view corridor shall be clearly defined on the site plan.

    1. Private Pathways: Private pathways which provide pedestrian access to the shoreline may be allowed within the buffer provided they are constructed of pervious material, are less than or equal to six (6) feet wide, and follow a route that minimizes erosion and gullying

    ——————————————————————————–

    (16)  NOT DISCUSSED OR ADDRESSED

    Taking of Private property for Public access

    The removal of any reference to  the taking of private property for Public access, Clallam County has the highest public access to public land in WA State. At the Private DOE meeting on June 6, 2012 Gordon White agreed that we have sufficient cause 51% to remove any taking of private property for public access.

    —————————————————————————–

    (17) DISCUSSED AND DISMISSED

    EPA. Precautionary setback are not legal

     As questioned by Rob McKenna, why are the DOE SMP setbacks more restrictive the EPA. Precautionary setback are not legal.

    ——————————————————————————–

     (18) LEGALITY OF 80% TAKING  NOT DISCUSSED NOT ADDRESSED

    ONE HUNDRED PERCENT (100%) NON-CONFORMING PROPERTY

    1. At least eighty percent (80%) of the buffer area between the structures and the shoreline and/or critical area is maintained in a naturally vegetated condition.

    What provisions have the DOE made to  stay within the LAW?

    “It is now undisputed that the county had no authority to deprive residents of the use of their own private property.”CAO’S 65 PERCENT” SEIZURE OF PROPERTY PLF Lauds Supreme Court for “Driving a Stake Through One of the Most Extreme Assaults on Property Rights in the U.S.”

    SEATTLE, WA; March 4, 2009: The Washington Supreme Court

    the CAO limited rural landowners with five acres or more to clearing only 35 percent of their property, forcing them to maintain the remaining 65 percent as native vegetation indefinitely. Rural landowners owning less than five acres were allowed to clear only 50 percent of their parcels. Affected landowners had to continue paying taxes on the portion of the property rendered useless by the CAO.

    —————————————————————————–

    (19) NOT DISCUSSED OR ADDRESSED

     THE PROVISIONS OF WAC173-26-191 ANYTHING THAT MAY BE  ILLEGAL AND UNCONSTITUTIONAL AT A STATE LEVEL,

     MAY ALSO BE  ILLEGAL AND UNCONSTITUTIONAL AT A COUNTY LEVEL AND SHALL NOT BE INCLUDED IN CLALLAM COUNTY SMP UPDATE.

     

    WAC 173-26-191

    Agency filings affecting this section

    Master program contents.

    2 The results of shoreline planning are summarized in shoreline master program policies that establish broad shoreline management directives. The policies are the basis for regulations that govern use and development along the shoreline.

    SOME MASTER PROGRAM POLICIES MAY NOT BE FULLY ATTAINABLE BY REGULATORY MEANS DUE TO THE CONSTITUTIONAL AND OTHER LEGAL LIMITATIONS ON THE REGULATION OF PRIVATE PROPERTY. THE POLICIES MAY BE PURSUED BY OTHER MEANS AS PROVIDED IN RCW 90.58.240.

    SOME DEVELOPMENT REQUIRES A SHORELINE PERMIT PRIOR TO CONSTRUCTION.

     A LOCAL GOVERNMENT EVALUATES A PERMIT APPLICATION WITH RESPECT TO THE SHORELINE MASTER PROGRAM POLICIES AND REGULATIONS AND APPROVES A PERMIT ONLY AFTER DETERMINING THAT THE DEVELOPMENT CONFORMS TO THEM. EXCEPT

    WHERE SPECIFICALLY PROVIDED IN STATUTE, THE REGULATIONS APPLY TO ALL USES AND DEVELOPMENT WITHIN SHORELINE JURISDICTION, WHETHER OR NOT A SHORELINE PERMIT IS REQUIRED, AND ARE IMPLEMENTED THROUGH AN ADMINISTRATIVE PROCESS ESTABLISHED BY LOCAL GOVERNMENT PURSUANT TO RCW 90.58.050 and 90.58.140 AND ENFORCEMENT PURSUANT TO RCW

    90.58.210 through 90.58.230.

    ————————————————————-

    If any of you read this complete comment? You understand fully, why I am critical of the two thirds majority of the Advisory Committees that failed to complete their responsibility to the citizens and private property owners of Clallam County on July 10, 2012,  prior to the final SMP Draft Proposal.

    INDEED, THE INTENT OF A PARTY CAN BE DETERMINED BY EXAMINING THE UNDERSTANDING OF A REASONABLE PERSON, AFTER CONSIDERATION IS GIVEN TO ALL RELEVANT CIRCUMSTANCES OF THE CASE INCLUDING THE NEGOTIATIONS, ANY PRACTICES THE PARTIES HAVE ESTABLISHED BETWEEN THEMSELVES, USAGES AND ANY SUBSEQUENT CONDUCT OF THE PARTIES.

    IF THE PARTIES DON’T WANT YOU TO DO IT, THE PARTIES WILL MAKE IT AS DIFFICULT AS POSSIBLE, INCLUDING BUT NOT LIMITED TO FINANCIALLY IMPOSSIBLE.

    The County Department of Community Development (DCD) has just released a Revised SMP Draft (June 2017). 


  • Clallam County WA SMP Update 2017?

    Clallam County WA SMP Update 2017?

    I received email notification because I am an interested party (since Jan 26, 2011).  The County Department of Community Development (DCD) has just released a Revised SMP Draft (June 2017).

    Clallam County Commissioners, Mark Ozias, Randy Johnson and Bill Peach, You are receiving this email because you are elected Clallam County representatives and you SHALL be deciding the fate of vested, voting, taxpaying, Shoreline private property owners on the Clallam County Shoreline Master Program (SMP) Update.

    Not one of you, the 2017 seated elected representative participated in the Clallam County SMP Update between 2009 and 2013.

    How bad was the Clallam County WA STATE DEPARTMENT OF ECOLOGY (DOE) SMP Update in 2009? 2010? 2011? 2012? 2013? 2014? and 2015? 2016?

    CONTENTIOUS…. OVER 600  PUBLIC COMMENTS WERE SUBMITTED.

    WHAT WOULD VESTED PRIVATE SHORELINE PROPERTY OWNERS HAVE TO COMPLAIN ABOUT?

    LET’S START WITH THE CLALLAM COUNTY  DCD SMP REVISED REVISIONS

    2014-2017

    The Revised Draft SMP (June 2017) shows proposed revisions to the November 2014 Draft SMP that the Clallam County Planning Commission held regional public hearings on in February 2015. The Planning Commission reviewed public comments at various Commission regular-meetings in 2015-2016. The Revised Draft SMP (June 2017) is based on these deliberations, comments from the Department of Ecology, and other clarifications/corrections.

    ————————————————————————————-

    A complete list of Clallam County DOE SMP UPDATE PUBLIC  comments 2010-2012

    doe smp public smp comments from 5/31/11 #100 to 7/02/12 #284

    citizenreview-clallamcounty.org/…/doe-smp-public-smp-comments-from-53111-100-to-…Jul 3, 2012TO WHOM IT MAY CONCERN. A COMPLETE LIST OF CLALLAM COUNTY DOE SMP COMMENTS 2010-2012.

    The SMP ball is soon to be thrown into the your court, it’s time for you, the newly elected on the block to step up to the plate.

    PLEASE SEND YOUR COMPLAINTS TO our elected commissioners they need to know how the 2017 Revised SMP Draft and update has and shall  impacted  you and your property. Below is their contact information:

    ——————————————————————————

    Indeed, elected in 2014, DCD Director Mary Ellen Winborn,. The Clallam County Department of Community Development is responsible for comprehensive …

    Director of Community Development

    Mary Ellen Winborn
    mwinborn@co.clallam.wa.us
    223 East 4th Street, Suite 5
    Port Angeles Washington 98362
    360-417-2321

    ——————————————————————————–

    Behind My Back | WA DOE Amending the SMA/SMP?

    www.behindmyback.org/2017/03/03/wa-doe-amending-the-smasmp/

    Mar 3, 2017 – Behind My Back | Ecology’s Back “Amended Plus ” SMP WAC’S … Shoreline Management | Introduction the the SMA | Washington State …

    This is my public comment on the Clallam County SMP Update

    It is a formal written complaint directed to Elected DCD Director Mary Ellen Winborn

    The Clallam County SMP Update has been a work in progress for over seven (7) years

    The first Public comment on the SMP Update, was Dec 5, 2009

    The latest update on the Clallam County SMP website is from November 2014

    AND THE STATUS OF CLALLAM COUNTY  SMP  MARCH 3, 2017?

    Clallam County Southwest Under way

    How bad was the Clallam County WA STATE DEPARTMENT OF ECOLOGY (DOE) SMP Update in 2009? 2010?2011? 2012? 2o13? 2014? and 2015? 2016?

    CONTENTIOUS…. Over 600  public comments were submitted.

    The  “LAST” PUBLIC FORUM” was held Jan 14, 2015  in Sequim WA

    The latest update on the Clallam County SMP website is from November 2014

    Only one, non-elected county employee has been involved in the SMP Update from start to finish.

    Who’s running the SMP Update behind our backs behind closed doors

    How much Funding has been granted to Clallam County by the DOE $549,986.00

    Who’s being paid behind our backs behind closed doors to Update the Clallam County Shoreline SMP?

    HAVE THE VESTED SHORELINE PROPERTY OWNING CITIZENS OF CLALLAM COUNTY BEEN LEFT OUT OF THE PUBLIC OPEN MEETING PROCESS FOR A  “COOLING OFF PERIOD?”

    WHAT WOULD VESTED PRIVATE SHORELINE PROPERTY OWNERS HAVE TO COMPLAIN ABOUT?

     

    The Revised Draft SMP (June 2017) shows proposed revisions to the November 2014 Draft SMP that the Clallam County Planning Commission held regional public hearings on in February 2015. The Planning Commission reviewed public comments at various Commission regular-meetings in 2015-2016. The Revised Draft SMP (June 2017) is based on these deliberations, comments from the Department of Ecology, and other clarifications/corrections.

    PLEASE SEND YOU COMPLAINTS TO our elected commissioners they need to know the impacts that this 2017 Revised SMP Draft and update has and shall have on you and your property.

    Contact information:

    County Commissioners

    Mark Ozias, District 1
    mozias@co.clallam.wa.us
    Clallam County Commissioners
    223 East 4th Street, Suite 4
    Port Angeles, Washington 98362-3000
    360-417-2233

    Randy Johnson, District 2
    rjohnson@co.clallam.wa.us
    Clallam County Commissioners
    223 East 4th Street, Suite 4
    Port Angeles, Washington 98362-3000
    360-417-2233

    Bill Peach, District 3
    bpeach@co.clallam.wa.us
    Clallam County Commissioners
    223 East 4th Street, Suite 4
    Port Angeles, Washington 98362-3000
    360-417-2233

    Not one of the 2017 seated elected representative participated in the Clallam County SMP Update between 2009 and 2013.

    How many of the 624 SMP  public comments have Clallam County Commissioner Mark Ozias, Randy Johnson and Bill Peach actually read?

    And, how many of the 624 SMP Public comments have been shoved under the rug, through the combined efforts of ESAAdolfson  SMP Consultant Margaret Clancy (between 2012 and 2017)  and Steve Gray, Deputy Director/Planning Manager Clallam County Dept. of Community Development using after the fact cut off dates for public comment et al,  and  a matrix system?

    ——————————————————————————–

    Not one of you, the 2017 seated elected commissioners, participated in the Clallam County SMP Update between 2009 and 2013.

    The SMP ball is soon to be thrown into the your court, it’s time for you, the newly elected, on the block, to step up to the plate.

    doe smp public smp comments from 5/31/11 #100 to 7/02/12 #284

    citizenreview-clallamcounty.org/…/doe-smp-public-smp-comments-from-53111-100-to-…

    Jul 3, 2012 – TO WHOM IT MAY CONCERN. A COMPLETE LIST OF CLALLAM COUNTY DOE SMP COMMENTS 2010-2012. Available on Clallam County …

    TO WHOM IT MAY CONCERN

    A COMPLETE LIST OF CLALLAM COUNTY DOE SMP COMMENTS 2010-2012

    Available on Clallam County SMP website.

    http://www.clallam.net/realestate/html/shoreline_management.htm

    All public comments are subject to Public Disclosure.

    I will complete the comments on #1 to #99 and document the pros and cons.

    Pearl Rains Hewett

    July:
    ·    070212 – RKonopaski – G
    ·    #284 clarifying the setbacks on marine shorelines?
    June:
    ·    062312 – ESpees – G
    ·    175-150 + 10 foot setbacks
    ·    061712 – PHewett – G
    ·    DOE private meeting
    ·    061412 – PHewett – G
    ·    Futurewise and Grays Harbor
    ·    061412 – PHewett – SED
    ·    WHAT IS THE ECONOMIC FUTURE OF CLALLAM COUNTY?
    ·    061112 – PHewett – G
    ·    See Nollan, 483 U.S. 825, 837 (1987). precautionary setbacks
    ·    060912 – PHewett – G
    ·    25 See Nollan, 483 U.S. 825, 837 (1987).
    ·    060712 – PHewett – G
    ·    #277 Citizens’ Alliance for Property Rights v. Sims. 65% taking violates law
    ·    060312 – ESpees – G
    ·    #276 public access to our shorelines
    May:
    ·    053012 – PHewett – SED
    ·    #275 RE-DESIGNATE TO FRESHWATER RURAL
    ·    052912 – PHewett – G
    ·    #274 COORDINATION PROCESS 43 UNITED STATES CODE SECTION 1712
    ·    052412 – RCahill – SMPdraft
    ·    #273 the spirit and intent of the Department of Ecology’s Shorelands and Environmental Assistance, publication number 09-06-029,
    ·    052212 – JBlazer – SED
    ·    #272 The problem… my parcel and the 2 parcels to the south would be hard pressed to build residences that take advantage of the marine view using the 175 ft setback in the proposed designation of Freshwater Conservancy.
    ·    052112 – MBlack – SMPdraft
    ·    #271 The overall concern I have is that you are in fact taking future uses away from
    ·    private land holders without clearly acknowledging doing so.
    ·    051712 – PHewett – G
    ·    #270 SELLING AND BUYING DOE SMP NON-CONFORMING PROPERTY
    ·    051612 – PHewett – PPS
    ·    #269 SMP Public Forum participation
    ·    051512 – ASoule – SMPdraft
    ·    #268 SMP references to sea level rise
    ·    051212 – PHewett – G
    ·    #267 FORKS SMP PUBLIC FORUM MAY 10, 2012
    ·    051212 – KNorman – SED
    ·    #266 I hope that you will reconsider the classification of these lots based on this information as to do otherwise would be a severe hardship on the owners of the lots and would constitute a “taking” of the land.
    ·    051112 – FutureWise-PPS – SMPdraft
    ·    #265 Clallam County v. Futurewise 7 years + lawsuit Carlsborg. The current SMP updates are an opportunity to significantly improve protection for the straits and the county’s other shorelines.
    ·    050812 – EBowen – G20
    ·    #264  S. Gray to Ed Bowen Final Draft WRIA 20 Preliminary SMP Elements Report
    ·    050812 – WFlint – SED
    ·    #263 The Lower Lyre River should be designated as Freshwater Residential (FRSD), and not Freshwater Conservancy (FC) as it is now proposed.
    ·    050812 – PHewett – G
    ·    #262 SCIENTIFIC PAPERS AND THE DUE PROCESS OF LAW DOE has consistently ignored questions asked on SMP comments, posted on the Clallam County SMP Update website, and at SMP Advisory meetings. I am requesting answers to the following questions to comply with the core principles of Due Process and the DOE SMP taking of private property in Clallam County.
    ·    050712 – USFWS – SMPdraft
    ·    #261  The Service strongly supports maintaining the feeder bluffs in their natural functioning condition.
    ·    050612 – PHewett – G
    ·    #260 If it is not recorded with the Clallam County Auditors Office it is not on the Property Title. What should be recorded with the Auditors office for Public Record?
    ·    050512 – ESpees – G
    ·    #259 The premise of the SMA/SMP Undate ‘that there is and environmental crisis’ that requires a draconian governmental intervention is bogus.
    ·    050412 – LMuench – G
    ·    #258 I think you would best be served by showing shrubs as well as trees. Since the graphics are done, what about a red arrow pointing to the trees saying “may be limbed for views.” This is a major issue with shoreline land owners.
    ·    050412 – ESpees – G
    ·    #257 The ECONOMIC IMPACT of the DoE imposed SMA/SMP Update for 2012 will be staggering!!!
    ·    050412 – PHewett – G
    ·    #256 Clallam County DOE SMP update, written text, uses our safety and protection as an excuse to take, restrict and control the use/development of our private property.
    ·    050312 – JBettcher – G
    ·    #255 I appreciate the public benefit of a healthy ecosystem but oppose the taking of private property by prohibiting private landowners from applying the best engineering practices to resist natural whims.
    ·    050212 – PHewett – G
    ·    #254 REAL ESTATE MARKET VALUE OF NON-CONFORMING PROPERTY
    April:
    ·    042812 – PHewett – G
    ·    #253 FEMA AND OTHER POLICY SPECIFIC INSURANCE COVERAGE
    ·    042812 – PHewett – G
    ·    #252 House Bill 2671  If a county appeals the (DOE) Department of Ecology’s final action on their local shoreline master program and  the appeal is given to the Growth Management Hearings Board?
    ·    042812 – PHewett – G
    ·    #251 No. 87053-5 IN THE SUPREME COURT OF THE STATE OF WASHINGTON
    ·    042612 – PHewett -G
    ·    #250 CLALLAM COUNTY- NEGLECT OF WIRA 20 SMP PRIVATE PROPERTY OWNERS
    ·    042112 – Spees – G
    ·    #249 this insane outrageous governmental over reach under the thinly veiled cover of saving the environment. The problem now is not the environment.
    ·    042112 – PHewett – G
    ·    #248 PARTIAL DISCLOSURE OF SMP IMPACT ON PRIVATE PROPERTY OWNERS
    ·    041812 – PHewett – G
    ·    #247 The statistics introduced at the last SMP Advisory meeting, on how many private property owners, property and single family dwellings will become non-conforming by the SMP Draft marine 175′, 150′ plus 10′ setbacks, has not been posted on the SMP web site.
    ·    041712 – Port of PA – G
    ·    #246 Table 4.1 the proposed draft buffer in row “a” should be modified from 100’ to 50’
    March:
    ·    032912 – PHewett – G
    ·    #245 THE MOST UNSCIENTIFIC PARTS OF THE DOE CLALLAM COUNTY SMP ARE, that even with DOE’S 1616 employees and a billion dollar budget.DOE doesn’t have a single analyst capable of compiling and reporting the most important documented/published scientific statistics provided by The Clallam County Inventory and Characteristic reports.
    ·    032612 – PHewett – G
    ·    #244 ESA Adolfson’s consultant’s failure to comply with WA State Law RCW 90.58.100 Each master program shall contain standards governing the protection of single family residences and appurtenant structures against damage or loss due to shoreline erosion.
    ·    032512 – PHewett – G20
    ·    #243 WIRA 20 Sol Duc River Reach 80 needs to be re-designated on proposed draft to 3.1.1.4 Freshwater Conservancy (FC)
    ·    032312 – RCrittenden – SMPdraft
    ·    #242 Thus, all regulation is evil by its nature and it is repressive. The best regulations are those that are the least that is necessary to accomplish their intended legitimate purpose. And “legitimate” is not to be broadly construed.
    ·    032212 – PHewett/RCrittenden – G
    ·    #241 Dr. Robert N. Crittenden SMP comments, testimony, tables and reviews
    ·    032112 – OEC – SMPdraft
    ·    #240  Change “should” to “shall” ,,,,culverts, and bridges shall be conducted using best practices….
    ·    031712 – PHewett – G
    ·    #239 PATENT LAND GRANTS ISSUED PRIOR TO STATEHOOD
    ·    031412 – MBarry – G
    ·    #238 These shorelines are critical for wildlife and natural ecological functions. I favor large setbacks. I favor development restrictions
    ·    030912 – PHewett – G/NNL
    ·    #237 Building Permit 2012-00014 issued to owners, David and Maria Tebow, Battle Creek MI. Two story 4 bedroom house 4770 sq feet, garage 927 sq feet, covered deck 173 sq feet with 19 plumbing drains (Number of Bathrooms?) Setbacks 60/25/25 Project value $486,781.18. the written guarantee bythe Clallam County DCD of no net loss to ecological functions (documented on building permit)
    ·    030512 – ESpees – SMPdraft
    ·    #236 There is no way that these voluminous shoreline land use policies can be understood. It takes no imagination to understand that this process is not ‘due process’ in the taking of beneficial use of our Private Property
    ·    030412 – PHewett – SMPdraft
    ·    #235 DOE Public Trust Doctrine web site (88 pages) has gone missing
    ·    030312 – KAhlburg – SMPdraft
    ·    #234 The last sentence runs directly counter to this assurance and needs to be modified or deleted. It otherwise will constitute yet another unfunded mandate burdening the County and “other entities” (which ones?).
    ·    030212 – PHewett – NNL/SMPdraft
    ·    #233 Lake Sutherland is a perfect example of Ecology’s NO NET LOSS.
    ·    With a 35 foot setback since 1976 there is no net loss of ecological function in Lake Sutherland.
    ·    030112 – MarineResourcesCouncil – SMPdraft
    ·    #232 It may also be possible that under certain development conditions, if done to minimize impervious surface and maximize water infiltration, could enhance the function of the buffer and perhaps allow for a narrower buffer.
    February:
    ·    022812 – FutureWise – SMPdraft
    ·    #231 The first half establishes the expected character of shoreline buffers, and is well stated. But the second half goes on to state that only 80% of the buffer vegetation is protected, and that 20% can be used for lawns and other use areas.
    ·    022812 – PHewett – NNL
    ·    #230 NO NET LOSS MENTIONED In law RCW 36.70A.480 (4) Shoreline master programs shall provide a level of protection to critical areaslocated within shorelines of the state that assures no net loss of shoreline ecological functions necessary to sustain shoreline natural resources as defined bydepartment of ecology guidelines adopted pursuant to RCW 90.58.060.
    ·    022812 – PHewett – NNL
    ·    #229 The policies, goals, and provisions of chapter 90.58 RCW and applicable guidelines shall be the sole basis for determining compliance of a shoreline master program
    ·    022712 – WDOE- SMP Statue
    ·    #228 Gordon White letter dated Feb. 27,2012 page 4, disclaimer of creating enforceable state LAW by rule on Page 88 of the WA State Public Trust Doctrine.
    ·    022412 – QuileuteNation – SMPdraft
    ·    #227 TRIBAL comment
    January:
    ·    010312 – LowerElwhaKlalllamTribe – SED
    ·    #226 TRIBAL comment

    SMP Comments 2011:
    December:
    ·    120811 – PHewett – G
    ·    #225 WETLANDS NOT ON SMP MAPS Attachments: Lowell OREGON Local Wetland Inventory Report DRAFT.docx
    ·    120811 – PHewett – G
    ·    #224 Perkins and Coie  Your Request on Tacoma SMP Attachments: 12-13-10 letter to Gary Brackett.pdf; SMA and Public Access.pdf
    ·    120711 -OlympicEnvironmentalCouncil (OEC) – G
    ·    #223 Sea level  rise and climate change
    ·    120611 – WDOE- ICR20
    ·    #222  Draft WRIA 20 Inventory and Characterization
    November:
    ·    113011 – ESpees – G
    ·    #221 In the WRIA Process and the SMA/SMP Update Process the concept of State regulation of land use based on Feeder Bluffs and Littoral Drift Cells is a False Construct.
    ·    112511 – ESpees – G
    ·    #220 The DoE’s current cram-down of NNL and increased set-backs based on precautionary principle and ‘new understandings of science’ (non-science/non-sense/pseudo-science) should be rejected.
    ·    112411 – ESpees – G
    ·    #219 It’s content is extremely pertinent to the work we are doing in Clallam County’s SMA/SMP Update.
    ·    111611 – MPfaff-Pierce – SED
    ·    #218 Specifically, I am requesting that you reclassify the entire Whiskey Creek Beach Resort area as Modified Lowland. Right now you are proposing that a short area west of the creek be designated as Modified Lowland and the rest as High Bank.
    ·    111111 – JPetersen – SED
    ·    #217 Many activities would be prohibited without really looking at the specifics.
    ·    111011 – PHewett – G
    ·    #216 This is on the DOE Public Trust Doctrine web site (88 pages)”Finally, SMP’S, unlike other comprehensive plans, are adopted as WAC’S and become part of the state’s Shoreline Master Program. As such, all local SMP rules, regulations, designations and guidelines BECOME STATE LAW AND ARE ENFORCEABLE. in this manner, protection of public trust resources and uses becomes binding.”
    ·    110711 – PHewett – G
    ·    #215 SMP FOLLOW THE LETTER OF THE LAW
    ·    110711 – PHewett – G
    ·    #214 Court: Washington Supreme Court Docket: 84675-8 Opinion Date: August 18, 2011 Judge: Johnson Areas of Law: Environmental Law, Government & Administrative Law, Zoning, Planning & Land Use Applicable Law and Analysis. In affirming the Court of Appeals, the Supreme Court explained that even though there is significant local government involvement in the creation of SMPs, the process is done in the shadow of the Department of Ecology’s (DOE) control.
    ·    110711 – PHewett – G
    ·    #213 the Shoreline Management Act dictates that the Department of Ecology retains control over the final contents and approval of SMPs. Therefore, SMP regulations are the product of state action and are not subject to RCW 82.02.020.”
    ·    110611 – PHewett – G
    ·    #212 EXCLUDED SMP DOE WAC’S DO NOT BECOME LAW
    ·    110511 – ESpees – NNL
    ·    #211 In keeping with regard to no net loss was unclear and without any foundation.
    ·    110511 – ESpees – G
    ·    #210 The law has recently been perverted by State Agencies to usurp private property rights, an uncompensated State taking by regulation.
    ·    110511 – PHewett – G
    ·    #209 There is no WA State law requiring any taking of private property for public access on the Clallam County SMP Update.
    ·    110411 – PHewett – G
    ·    #208 WHO CAN STOP DOE WAC’S FROM BECOMING STATE LAWS?
    ·    110411 – PHewett – G
    ·    #207 Victory for PLF Whatcom County’s shoreline management rules conflict with state law, which mandates that counties “shall provide for methods which achieve effective and timely protection against loss or damage to single family residences and appurtenant structures due to shoreline erosion.” RCW 90.58.100.
    ·    110411 – PHewett – G
    ·    #206 BY Law there is NO mention of the words “imminent or danger or soft armoring” IF THIS WORDING IS USED ON THE CLALLAM COUNTY SMP, IN SPITE OF THE FACT THAT IT CONTRADICTS WA STATE LAW RCW 90.58.100 Protection of single family residences IT WILL BECOME CLALLAM COUNTY LAW.
    ·    110311 – WDFW – ICR
    ·    #205 A useful tool may be to describe, in general, the range of possible existing conditions within any portion of the shoreline.
    ·
    October:
    ·    103111 – WDOE – ICR
    ·    #204  Not a copy format
    ·    103111 – JLarson – ICR
    ·    #203 I made at last SMP-WG meeting be incorporated into record
    ·    102011 – PHewett – SED
    ·    # 202 Who’s toes will you be stepping on by using this? Will you be able to notify the private property owners that are inadvertently compromised? Are there any single family residences, in any areas, where you have not specifically provided comment on protection by Law?
    ·    102011 – PHewett – SED
    ·    #201 Is this another WAC overstepping it’s authority and the LAW?
    ·    101911 – PHewett – NNL
    ·    #200 The concept of no net loss in this State originated with earlier efforts to protect wetlands. In 1989, Governor Booth Gardner signed an Executive Order establishing a statewide goal regarding wetlands protection.
    ·    101811 – JEstes – G
    ·    #199 There are 3,289 shoreline property owners in Clallam County about to be subject to
    ·    further regulation and restriction on the use of their land.
    ·    101711 – PHewett – G
    ·     #198 Unconstitutional Conditions of  WAC 173-26-191 Some master program policies may not be fully attainable by regulatory means due to the constitutional and other legal limitations on the regulation of private property.
    ·    101711 – WSP – ICR20
    ·    #197 Any additional comments on the two Clallam County SMP Inventory and Characterizations Reports are due by October 31, 2011
    ·    101111 – PHewett – G
    ·    #196 WAC’S ARE NOT LAW’S? Guidelines Are Not Law’s? Rules Are Not Law’s?
    ·    100811 – PHewett – ICR
    ·    #195 WAC 365-195-905 Criteria for determining which information is the best available science
    ·    100611 – PHewett – G
    ·    #194 REMOTE VIEWING AND SPACIAL DATA I did not find a State- of- the art- GSI and remote sensing facility for WA State?
    No b comment for #193?
    ·    100411 – PHewett – G/ICR
    ·    #192 Please bring the SMP Public Comments up to date.
    ·    100311 – JTatom – G
    ·    #191 As a property owner in Clallam County, I cannot imagine that you, as servants of the county, would even consider placing additional restrictions on residents who live near shorelines (marine, rivers, streams and lakes). Already we find ourselves so restricted that we are unable to use large portions
    ·    of our “privately” owned property.
    ·    100111 – PHewett – G
    ·    #190 Is it the intent, of two Elected County Commissioners, that total control of all private property in Clallam County, be given to the Federal Government and the WA State DOE, one way or the other?
    September:
    ·    092611 – PHewett – G/ICR
    ·    #189 Taking of Private Property for Public Access I insist that ESA Adolfson give us the total land acreage of private property that is affected by the SMP Update subject to NO NET LOSS and taking for Public Access.
    ·    092511 – PHewett – G
    ·    #188 Noxious Weed Control ‐ LMD#2 Lake Sutherland
    There is no #187  public comment?
    ·    092211 – PHewett – G
    ·    #186 SHORELINE RESIDENTS SWAMPED BY REGULATIONS
    ·    092211 – PHewett – ICR
    ·    #185 I tried to stress the fact that it is not lack of public land, it is the lack of public access to that publically owned land,
    ·    that is the problem.
    ·    092211 – PHewett – ICR
    ·    #184 CLALLAM COUNTY SHORELINE INVENTORY AND CHARACTERISTIC REPORT Based on the “Best Available Science?”
    ·    092211 – JamestownSKlallamTribe – ICR
    ·    #183 Tribal comment
    ·    091311 – LowerElwhaKlallamTribe – ICR
    ·    #182 Tribal comment
    ·    091011 – PHewett – G
    ·    #181 CLALLAM COUNTY SECTION 35.01.150 Real property assessments. PROTECTION FOR LOSS OF PRIVATE PROPERTY VALUE?  The restrictions imposed by the Shoreline Master Program shall be considered by the County Assessor in establishing the fair market value of the property.
    ·    091011 – PHewett – G
    ·    #180 PUBLIC COMMENT REPORT ON SMP Public Forum July 14, 2011
    ·    090411 – JLewis – CR/ICR
    ·    #179 Public access across our property through our wetlands and over our berm to our private beach would be of great concern to us. Here are some questions and concerns we’d like addressed and you consider amending the provisions for providing public shoreline access:
    ·    090311 – ESpees – G
    ·    #178 The Drift Cells, Littoral Drift, and
    ·    Feeder Bluffs Construct are so much BS/Smoke and Mirrors.
    ·    090311 – ESpees – G
    ·    #177 The Shoreline Master Program Update is rigged. NNL & larger setbacks do not represent the ‘will of the people’. It does not protect the rights of the Citizens.
    ·    090211 – ESpees – G
    ·    #176 I gave my opinion about ‘locking up’ shorelines property based on salmon and endangered species as a pretext
    August:
    ·    083111 – WDNR – ICR
    ·    #175 Incidentally, many of the docks and other development may
    ·    encroach onto State owned aquatic lands without proper DNR authorization.
    ·    083111 – MarineResourcesCouncil – ICR
    ·    #174 There is obviously no “ground truthing” of the information in this report.
    ·    083111 – JLWisecup – G
    ·    #173 It lists it as a slide area although for the past 32 years we have had no indication of any land movement or building shift.
    ·    083111 – ESpees – G
    ·    #172 It is more loony insanity being foisted on the Citizens of the State of Washington by a Government and their agents that
    ·    are out of control.
    ·    083111 – ESpees -G
    ·    171 The SMA/SMP and the WRIA processes are a means of locking up, transferring ownership to the State, and regulating the use of these areas/preventing private economic and other beneficial use of these prime areas.
    ·    082811 – PHewett – G
    ·    #170 SILT DAMAGE FROM ELWHA TO DUNGENESS SPIT?
    ·    082511 – ElwhaMorseMgmtTeam – ICRMaps
    ·    #169  Chris Byrnes commented on the yellow dots off shore (indicating “no appreciable drift”), argued that if it was so small, there wouldn’t be drifting anyway.
    ·    082511 – CoastalWatershedInstitute – ICR
    ·    #168 The characterization needs to be revised to include existing CLALLAM specific information and appropriate relevant recommendations that are in this existing information.
    ·    082511 – DAbbott – G
    ·    #167 I would like to see every effort made to ensure the constitutional rights of private property ownership made by those who have influence in our lawmaking process. These rights have been encroached upon over the years and there is a renewed concern today by many private citizens.
    ·    082411 – PHewett – G
    ·    #166 WA State SMP is requiring Public access on private property at the expense of the property owner.
    There is no comment#164
    There is no comment #163
    ·    081011 – MarineResourcesCouncil – ICR
    ·    #162 I urge you to look at the reach/s or resource issues within all reaches for accuracy, omissions, and errors.
    ·    There is no comment #161
    ·
    ·    081011 – WSP – ICR
    ·    #160 not able to copy
    ·
    ·    There is no comment #159
    ·
    ·    There is no comment #158
    ·
    ·    080511 – PHewett – ICR
    ·    #157 Wetlands are not included on SMP Update maps showing the areas that are a threat and risk of development.
    ·
    ·    There is no comment #156
    ·
    ·    There is no comment #155
    ·
    ·    080111 – FutureWise – ICR
    ·    #154 The Sierra Club
    July:
    ·    072611 – WASeaGrant – ICR
    ·    #153 Coastal Hazards Specialist
    There is not comment #152
    ·    072211 – PHewett – G
    ·    #151 Fact or Fiction, It is illegal to collect water in a rain barrel?
    ·    The State owns all rainwater?
    ·    072011 – CCPlCom – ICR
    ·    #150 The July Forum attendance was low and those that intended appeared to be struggling with the information presented and the questions to ask.
    There is no comment #149
    ·    072011 – PHewett – ICR
    ·    #148 Marine and Fresh water reach’s impaired by water temperature
    ·    072011 – PHewett – G
    ·    #147 Freshwater reaches impaired by water temperature (32) Marine reaches impaired by water temperature (6) Contaminated Marine Reaches (5)
    ·    Contaminated Freshwater Reaches (2) plus several
    ·    072011 – ESpees – G
    ·    #146 What the hell does NNL (No Net Loss of ecological function) mean? What is the plan for the amount of setbacks? What is the basis of this vague indefinable policy?
    ·    072011 – PHewett – ICR20
    ·    #145 On page 5-14 HOKO_RV_05 is not listed. Shore line length 3.8 miles and Reach area 246.40 acres 100% timber
    ·    071711 – PHewett – G
    ·    #144 TOP TEN PUBLIC SMP UPDATE CONCERNS
    ·    071711 – ESpees – G
    ·    #143 Tribes not affected by Shoreline Mgmt. Plan Updates
    ·    071611 – ESpees – G
    ·    #142 the DoE/EPA attempt to strip the Citizens of their private property rights.
    ·    071611 – ESpees – G
    ·    #141 It uses Drift Cells and Littoral Drift as excuses to take away private use and protections of private property. This has to do with ‘feeder bluffs’
    ·    071211 – TSimpson – ICR
    ·    #140 Page 6-12 Needs Correction :Lines 19-22
    ·    071211 – PHewett – ICR
    ·    #139 COLD ENOUGH?Based on their own reports and data, the amount of tree canopy, logging, development and public access are NOT factors in the impaired water temperature? Perhaps 50 years ago the water WAS cold enough?
    ·    071211 – PHewett – ICR
    ·    #138 Why is Green Crow the only contaminator mentioned by name? We should be given the exact location of every specific contaminated site and
    ·    the full identity of EVERY contaminator.
    ·    071111 – ESpees – G
    ·    #137 Conspicuously absent from the report of the first meeting is an accounting of the economical impact.
    ·    070811 – PHewett – ICR
    ·    #136 If more public access is needed, it is not the responsibility of Private Property Owner’s to provide it.
    ·    070811 – PHewett – ICR
    ·    #135 The Clallam County SMP update requires private property owners to give public access to their privately owned marine shorelines, prior to permitting development.
    ·
    ·    No comment # 134
    ·    No comment #133
    ·    No Comment #132

    SMP Comments 2011 cont.
    June:
    ·    062811 – JLMcClanahan – G20
    ·     #131 She was very concerned about any
    ·    potential regulatory changes that would result in the loss of options for using their two parcels in the future.
    ·    062411 – RTMcAvoy – G20
    ·    #130 they are against any such change for the reasons stated herein.
    ·    062411 – DMansfield – G20
    ·    #129 Adamant about no further restrictions on property
    ·    062411 – PCWidden – G20
    ·    #128 Concerns about changing the current SMP status from Rural to Conservancy.
    No comment #127
    ·    062011 – JEstes – G
    ·    #126  detail on how members of the public and affected property owners are being notified
    No Comment # 125
    ·    060611 – WDOE – CR
    ·    #124 local DOE
    ·    060611 – PortofPA – CR
    ·    #123 LIMIT NOT PROHIBIT
    ·    060411 – ESpees – CR
    ·    #122 The salmonid stocks in Clallam County are not limited by freshwater habitat
    ·    060311 – JamestownSKlallamTribe – CR
    ·    #121 Tribal Comment
    ·    060311 – HBell – CR
    ·    #120 This is not required by the RCW nor the WAC. WAC 173-26-241
    ·    060311 – WSP – CR
    ·    #119 State Park comment
    ·    060311 – WDOE – CR
    ·    #118 Local DOE
    ·    060311 – ESpees – CR
    ·    #117 By Dr. Robert N. Crittenden
    ·    060211 – RCrittenden – CR
    ·    #116 the low abundance of these stocks is also being used, to perpetrate the deception that it is caused by habitat loss.
    ·    060211 – JEstes – CR
    ·    #115 the CR is one of several steps the County will take to consider if any existing “policies or regulations need to change.” There must be demonstrated
    ·    need for any changes and all affected landowners should be invited to consider any changes.
    ·    060211 – SForde – G
    ·    #114 Which one of my individual rights are you protecting with the Shoreline Master Plan and/or any updates to it? The answer: None – in fact, you are violating them.
    ·    060211 – QuileuteNation – CR
    ·    #113 Tribal comment
    ·    060211 – CRogers – CR
    ·    #112 -Page 4 typo error
    ·    060211  –  QuileuteNation – CR
    ·    #111 Tribal comment
    ·    060111 – AStevenson – CR
    ·    #110 a marked up PDF of the Consistency Review
    ·    060111 – ESpees – G
    ·    #109 SMP Update – SMP Update Rigged Process
    No comment #108
    ·    060111 – PHewett – G #107
    ·    TOTALITARIAN: by definition(concerned with) arrogating (to the state and the ruling party) all rights and liberty of every choice, including those normally belonging to individuals, etc.
    ·    060111 – MTWalker – G
    ·    #106 The SMP should be rejected in all it’s forms. It erodes our rights and freedoms, does not comply with and is in fact contrary to the Constitution, is poorly written, poorly organized, vague, and its objectives are ambiguous/obscure.
    ·    060111 – ESpees – G
    ·    #105 Tribes Not Affected
    May:
    ·    053111 – ESpees – G
    ·    #104 The SMP erodes our rights and freedoms
    ·    053111 – ESpees – G
    ·    #103 The NNL Policy, larger setbacks and buffers, and new forced public access to private property will further erode our freedoms.
    ·    053111 – MGentry – G
    ·    #102 Green Point, group. 35 were invited and 17 showed up plus Dave Hannah was there to answer questions on bluff stability. Of the 17 only one was aware of SMP or said they had been contacted about forums.
    ·    053111 – PHewett – G / CR
    ·    #101 Pacific Legal Foundation If government blocks access to your land, it has committed a taking Dunlap v. City of Nooksack
    ·    052911 – ESpees – G
    ·    052911 – PHewett – G
    ·    052811 – ESpees – G
    ·    052811 – RHale – G
    ·    052711 – ESpees – G
    ·    052711 – PHewett – G
    ·    052611 – MGentry – G
    ·    052111 – PHewett – G
    ·    051811 – JPetersen – CR
    ·    051811 – NOTAC – CR
    ·    051311 – PHewett – G
    ·    051311 – PHewett – G
    ·    051311 – PHewett – G
    ·    051011 – TSummer – G
    ·    050611 – PHewett – G
    ·    050611 – PHewett – CR
    ·    050511 – PHewett – CR
    ·    050511 – PHewett – CR
    ·    050511 – PHewett – G
    April:
    ·    042611 – ESpees – G
    ·    042311 – MBlack – G
    ·    042011 – KAhlburg – G
    ·    041811 – QuileuteNation – G
    ·    041411 – RColby – G
    ·    041411 – TSimpson – G
    ·    041211 – BBrennan – G
    ·    041111 – NN – G
    ·    041111 – MGentry – G
    ·    041111 – NN – G
    ·    041111 – RMorris – G
    ·    041111 – NMessmer – G
    ·    041011 – RMorris – G
    ·    04 –11- RMorris – G
    March:
    ·    031511- PHewett – G
    ·    031511 – RMorris – G
    ·    031511 – RMorris – G
    ·    031411 – MGentry – G
    ·    031111- JWare – G
    ·    030211 – PHewett – G
    ·    030211 – PHewett – G
    February:
    ·    021711 – MLangley – G
    ·    021511 – PHewett – G
    ·    020211 – RBrown – G
    January:
    ·    012611 – MBoutelle – G
    ·    012111 – CAbrass – G
    ·    011811 – DJones – G
    2010:
    ·    110810 – WDNR – G
    ·    080510 – PSP – G
    ·    031010 – WDOE – PPS
    ·    030910 – WDOE – PPS
    ·    030810 – LMuench – PPS
    ·    030410 – QuileuteNation – PPS
    ·    022410 – FutureWise – PPS
    ·    020910 – JMarrs – PPS
    2009:
    ·    120509 – DemComm – G

    Posted in Shoreline Mgmt. Plan

    Comments are closed.